New Orleans Second Class Stationary Boilers 661-LA Exam Prep 2026 | Questions & Rationales

Document preview thumbnail
Preview 4 out of 99 pages

Prepare confidently for your Louisiana license with this complete practice exam bank for the New Orleans Second Class Stationary Boilers 661-LA test. This study guide features comprehensive practice questions with verified answers and detailed rationales strictly aligned with ASME BPVC Section I, CSD-1, NBIC, and local municipal codes. It is the ultimate resource for stationary engineers looking to master safety protocols, pass their certification on the first try, and advance their industrial maintenance careers.

Content preview

Louisiana (New Orleans) Second Class Stationary
Boilers 661-LA 661 Exam 2026

Complete Practice Questions with Correct Answers &
Detailed Rationales

Based on ASME BPVC Section I, CSD-1, NBIC, and City of New
Orleans Requirements


QUESTION 1
What is the correct gas-to-air mixture for a gas-fired boiler?

A) 20% gas to 80% air
B) 25% gas to 75% air
C) 30% gas to 70% air
D) 40% gas to 60% air

C) 30% gas to 70% air

Rationale: The proper gas-to-air mixture for a gas-fired boiler is 30% gas to 70% air. In
special arrangements, the gas percentage can be as high as 100% . This is a critical
combustion parameter tested on the 661-LA exam.




QUESTION 2
How much clearance from the top of the boiler is needed for a high-pressure boiler that
produces 70,000 lbs of steam?

A) 5 feet
B) 6 feet
C) 7 feet
D) 8 feet

C) 7 feet

,Rationale: A high-pressure boiler producing 70,000 lbs of steam requires 7 feet of
clearance from the top of the boiler. This is a specific New Orleans code requirement for
boiler room clearances .




QUESTION 3
How often should a complete external inspection of the boiler be performed?

A) Once per week
B) Once per shift
C) Once per month
D) Once per year

B) Once per shift

Rationale: A complete external inspection of the boiler should be performed once per shift.
This includes checking for leaks, proper operation of safety devices, and general system
integrity .




QUESTION 4
With 24-hour boiler operation, how often should the water level be checked?

A) Every hour
B) Once per shift
C) Every 4 hours
D) Every 6 hours

B) Once per shift

Rationale: With 24-hour operation, the water level must be checked at least once per shift.
This is a critical safety requirement to prevent low-water conditions that can cause boiler
failure .

,QUESTION 5
How often should the Low Water Cutoff (LWCO) be checked?

A) Hourly
B) Once per shift
C) Weekly
D) Monthly

B) Once per shift

Rationale: The Low Water Cutoff should be checked once per shift to ensure it will function
properly in an emergency. The LWCO is a critical safety device that shuts down the burner
when water level drops below safe limits .




QUESTION 6
How often should the High Limit Switch be checked?

A) Once per shift
B) Weekly
C) Monthly
D) Annually

D) Annually

Rationale: The High Limit Switch should be checked annually to verify it will shut down the
boiler at the proper temperature or pressure .




QUESTION 7
How often should the operating control be tested?

A) Once per shift
B) Weekly
C) Monthly
D) Annually

D) Annually

, Rationale: The operating control should be tested annually to ensure it is functioning
correctly and maintaining the proper operating parameters .




QUESTION 8
How often should the testing and inspecting of burner components be performed?

A) Once per shift
B) Weekly
C) Monthly
D) Annually

D) Annually

Rationale: Burner components should be tested and inspected annually to ensure proper
combustion, safety, and efficiency .




QUESTION 9
What is the legal limit of acceptable asbestos particles in the air?

A) 0.01 fibers per cubic centimeter
B) 0.05 fibers per cubic centimeter
C) 0.1 fibers per cubic centimeter
D) 0.5 fibers per cubic centimeter

C) 0.1 fibers per cubic centimeter

Rationale: The legal limit of acceptable asbestos particles is 0.1 fibers per cubic centimeter
of air. This is the OSHA permissible exposure limit (PEL) for asbestos .




QUESTION 10
After opening a boiler for repairs, what percentage of oxygen is needed for safe entry?

Document information

Uploaded on
August 7, 2026
Number of pages
99
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$33.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
CornelWest
3.7
(261)
Sold
1631
Followers
1128
Items
12876
Last sold
3 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions