• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 16 pages
Exam (elaborations)

Aic 123 Exam 2026 Latest Update Questions And Correct Veified Answers Already Graded A+

Document preview thumbnail
Preview 3 out of 16 pages

AIC 123 EXAM 2026 LATEST UPDATE QUESTIONS AND CORRECT VEIFIED ANSWERS ALREADY GRADED A+

Content preview

AIC 123 EXAM 2026 LATEST UPDATE
QUESTIONS AND CORRECT VEIFIED
ANSWERS ALREADY GRADED A+

Which of the plyform orientations provides the strongest formwork system? - ANS-
parallel to the span

which party is responsible for the design of the concrete form work - ANS-field
engineer

Wale Load: 1550 pounds per lineal foot. Wale Lumber: No. 2 Southern pine, S4S. Wale
Support Conditions: continuous over 3 or more spans. Wale Horizontal Shear (F'v): 225
psi. Wales: 2 x 8 double wales at 36 inches center-to-center. What is the maximum
allowable tie spacing in inches? - ANS-51.5

concrete pressure: 1102 psf. Stud Load: Stud Lumber: No. 2 Southern Pine, S4S. Stud
Support Conditions: Continuous over 3 or more spans. Stud Horizontal Shear (F'v): 225
psi. Studs: 2 x 8 studs, spaced 10 inches center-to-center. Wale Lumber: No. 2
Southern pine, S4S. Wale Support Conditions: continuous over 3 or more spans. Wale
Horizontal Shear (F'v): 225 psi. Wales: 2 x 8 double wales at 36 inches center-to-center.
What is the uniform wale load (rounded) in pounds per lineal foot? - ANS-3000

Concrete Pressure: 1102 psf. Rate of Pour: 10 feet per hour. Temperature of Concrete:
75F. Wall Height: 22 feet. Wall Thickness: 15 inches. Stud Load: Stud Lumber: No. 2
Southern Pine, S4S. Stud Support Conditions: Continuous over 3 or more spans. Stud
Horizontal Shear (F'v): 225 psi. Studs: 2 x 8 studs, spaced 10 inches center-to-center.
What is the uniform stud load (rounded) in pounds per lineal foot? - ANS-918

what is the standard in north america for the outer layer of plyform - ANS-the grain of
the outer layer is parallel to the long dimension

according to the
ACI 347 committee what is the maximum rate of pour allowed for a wall in feet per hour
- ANS-10 fr per hour

Which of the following references is incorporated by reference for the design of vertical
and horizontal forms and a copy shall be maintained on the job site at all times? - ANS-
American Concrete Institute's publication ACI 347 titled, FORMWORK FOR
CONCRETE

what is the weight of range of a cubic foot of normal concrete for design purposes -
ANS-150-154

,Assume that you have concrete that weighs 150 pounds per cubic foot and the concrete
slab is 10 inches thick. What is the dead load in pounds per square foot? - ANS-125.0

what is the minimum live load for motoized buggies per square foot - ANS-75

what is the term called which requires all bidders to include in their bid a specified
amount of unit price for a particular - ANS-cash allowance

what types of projects establish prevailing wage rates - ANS-federally funded projects

which document establishes the forms content and procedures for submitting the bid
proposals - ANS-instructions to bidders

which document issued by the architect illustrates what is to be built - ANS-plans

which document requests that additional information be submitted by the bidder within
48 hours of bid opening - ANS-proposal supplements

which document describes the duties and responsibilities of each party and the
business procedures for administering the contract - ANS-general conditions

which document speicfies the existing soil conditions - ANS-information abaliable to
bidders

which document describes quality of work and quality of the materials and the
construction execution procedures - ANS-techinical specifications

which document makes changes, modifications and corrections prior to bid opening -
ANS-addenda

Which document applies to the Contractor and the Subcontractors and describes the
administrative, procedural and temporary procedures on the job site? - ANS-general
requirements

which document is submitted to the owner for bid consideration before the contractor
can receive the bidding documents - ANS-pre-qualification forms

which document is submitted by each bidder stating that their bid was arrived at without
any conferring with other prime bidders - ANS-noncollusive affidavit

which document contains description of the alternate(s) - ANS-general requirements

which following documents is normally incorporated by reference - ANS-general
conditions

, which document describes the business procedures for a specific project and they
change the initial procedures - ANS-supplementary conditions

which document establishes the labor rates on a project - ANS-prevailing wage rate
schedule

which document specifices the regulations required such as soil erosion or minorities -
ANS-general requirements

which of the following documents are submitted by the contractor at bid opening - ANS-
proposal form, bid breakdown, addendum, bid bond, and noncollusive affidavit

what is the name of the law principle for referring the contractor to other documents that
are not contained in the package provided - ANS-incorporated by reference

which document specifies the temporary facilities needed on a project - ANS-general
requirements

According to the OSHA Construction Safety Standards, what is required for shoring
systems more than 20 feet deep? - ANS-The Registered Professional Engineer shall
design the protection system.

which of the following temporary systems is utilized to support freshly placed concrete
which is poured continuously in a vertical direction - ANS-slip form system

which of the following systems is designed to restrain horizontal temporary loads such
as soil and water - ANS-sheet piling

what is the concrete pouring method called that is used to pour concrete under water -
ANS-tremie

what is another name for sheeting - ANS-uprights

which party is normally responsible for designing the temporary structures - ANS-
contractor

what does "close sheeting" mean in relationship to a shoring system - ANS-the spacing
between timber planks not to exceed 1/2 inch

Which of the following systems is utilized for supporting an existing structure when the
new excavation will be below the existing structures foundation while the extension to
the existing foundation is being placed? - ANS-underpinning q

Assume you are lifting an item onto the bridge deck. The deck is 37 feet above the
ground and the horizontal distance from the centerline of the rotation is 70 feet. What is
the minimum length of the boom required? - ANS-120 ft

Document information

Uploaded on
August 7, 2026
Number of pages
16
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$24.89

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
1
Followers
0
Items
255
Last sold
11 months ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions