Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 6 pages
Exam (elaborations)

North Carolina NC Septic Installer Exam Key Concepts Complete Study Guide with Verified Answers 2026

Document preview thumbnail
Preview 2 out of 6 pages

Designed specifically for North Carolina Septic Installer certification preparation, this study guide reviews key concepts, licensing requirements, onsite wastewater systems, installation methods, inspections, maintenance, and exam-focused practice questions.

Content preview

NC Septic Installer Exam Key Concepts
Study online at https://quizlet.com/_gw63ln

1. Setback for Well (serving one 50 Feet
family)

2. Setback from Property Line 10 Feet

3. Setback from Lake/Pond in- 50 Feet
cluding Streams

4. Setback from Water Line 10 Feet

5. Setback from Foundation or 5 Feet
Deck

6. Setback from Basement/Cel- 15 Feet
lar

7. Setback from In-Ground Pool 15 Feet

8. Setback from Above-Ground 5 Feet
Pool

9. Setback from Buried Storage 10 Feet
Tank

10. Permitting Process 1) Application
2) Improvement Permit (IP)
3) Construction Authorization (CA)
4 Operation Permit (OP)

11. Septic Tank 1) Structurally Sound
2) Watertight
3) Covered Receptacle

12. Septic Tank Size

1/6

, NC Septic Installer Exam Key Concepts
Study online at https://quizlet.com/_gw63ln

4 Bedroom or less = 1,000 Gallon
5 Bedroom = 1,250 Gallon

13. Septic Tank Inlet must be 2 inches
_______ inches about outlet

14. Pump Tank Size Equal to or greater than Septic Tank

15. Effluent Filter 1) On outlet end of septic tank
2) Shall extend 25 - 50% into liquid depth
3) Solvent welded to 3" pipe

16. When must a tank be traffic Greater than 3 Feet in Ground
rated

17. Tank Strength Requirement 1) 4,000 psi at 28 days
2) 3,500 psi before leaving yard

18. D-Box 1) Watertight and sound Contruction
2) 2 feet from septic tank, 2 feet from drain field
3) Pipe from Septic Tank to D-box is level for first 2 feet

19. Control Panel Box NEMA 4x

20. Control Panel Requirements 1) HOA Switch
2) Event Counter
3) Run Light
4) Overload Protection

5) Motor Contractor or Solid-State Relay
6) Elapsed Time Meter
7) Circuit Breakers

21. Control Panel Mount 24" above finished grade to bottom of panel
2/6

Document information

Uploaded on
August 7, 2026
Number of pages
6
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$11.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
BRAVOSTUVIA
4.1
(13)
Sold
80
Followers
3
Items
3325
Last sold
3 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions