ARE 5.0 CONSTRUCTION AND EVALUATION EXAM |ACTUAL QUESTIONS & VERIFIED ANSWERS UPDATED EDITION |GRADED A+

Document preview thumbnail
Preview 4 out of 61 pages

ARE 5.0 CONSTRUCTION AND EVALUATION EXAM |ACTUAL QUESTIONS & VERIFIED ANSWERS UPDATED EDITION |GRADED A+

Content preview

ARE 5.0 CONSTRUCTION AND EVALUATION EXAM
|ACTUAL QUESTIONS & VERIFIED ANSWERS 2026-
2027 UPDATED EDITION |GRADED A+

Question 1

(3) ways cost estimates can be performed during Programming

CORRECT ANSWER

1. Unit cost system.

2. Historical data on similar types of projects.

3. Cost per square foot.




Question 2

Cost estimating method used during the Schematic Design

CORRECT ANSWER

Preliminary (rough) estimates are based on pricing major elements, such as structural
system selected and the MEP systems used.




Question 3

Cost estimating method used during the Design Development

CORRECT ANSWER

Detailed pricing based on the actual components being considered, including windows,
curtain walls, finishes and equipment.




Question 4



1
@THE STUDY VAULT

,Cost estimating method used during the Construction Documents

CORRECT ANSWER

Complete and final pricing of the project, based on direct quotes from suppliers, installers,
sub-contractors and manufacturers.

Requires great deal of effort and can only be done once nearly everything in the building
has been specified.

This pricing is a final check before construction begins/allows for revision to the design as
needed to meet the budget.




Question 5

Factors that can have an effect on cost estimates

CORRECT ANSWER

1. Availability of labor & material, labor rates, material prices, resources to produce the
material, convenience of transportation, location (more remote = more costly), less
predictable costs of rural areas.

2. High Interest Rates = less housing construction = lower material prices

Increased cost of living = increased union wages and higher labor costs




Question 6

Typical profit margin factored into the Construction Cost estimate
CORRECT ANSWER

15-20% for smaller projects

10-15% for larger projects

5-10% for ver large projects




Question 7

2
@THE STUDY VAULT

,Typical fees of Engineering Consultants (Struc., MEP, Civil)

CORRECT ANSWER

Mechanical: 15%

Electrical: 12.5%

Civil: 10.5%

Structural: 9.4%

(% Construction Cost)




Question 8

ENR 20 Cities Building Cost Index

CORRECT ANSWER

Cost estimating with Parameter Costs can be adapted to a city by using ______ or adding
an inflation factor.




Question 9

A Pro-forma is a financial analysis of the building project, showing costs and return on
investment.

This report is typically done by the client at the beginning of the project to determine if
the project will be profitable.
CORRECT ANSWER

What is Pro-forma?

Who does it?

During what phase of the project is it typically done?




Question 10


3
@THE STUDY VAULT

, General Obligation Bond

CORRECT ANSWER

Municipal bond issues when a state or local government wants to raise money for a
project.

Shareholders (investors) are guaranteed to be repaid using future tax revenues.




Question 11

Revenue Bond

CORRECT ANSWER

Type of municipal bond where the shareholders are promised payment from the revenue
collection of the project, such as tolls from a new bridge, instead of being repaid by future
tax revenue.

It is less secure than a General Obligation Bond and typically offer slightly higher interest
rates.




Question 12

(5) phases used by firms to help in cost estimating
CORRECT ANSWER

1. Pre-planning/Proposal Phase: Cost is broken down by units, which would come from the
occupancy of the building.

2. Programming Phase: Function of spaces and unit costs come from similar buildings.

3. Schematic Design: Determines major elements in the building, such as number of
plumbing fixtures, electrical layout, structure, and mechanical systems.

4. Design Development: Defined materials like windows, doors, dropped ceilings, and
cabinets are added.

5. Construction Documents: Finishes are in place and should reflect the pre-bid cost
breakdowns.




4
@THE STUDY VAULT

Document information

Uploaded on
August 6, 2026
Number of pages
61
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$16.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
THESTUDYVAULT
3.2
(17)
Sold
127
Followers
5
Items
13208
Last sold
1 hour ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions