• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 1 out of 3 pages
Other

Tec 226 Accurate Study Guide

Document preview thumbnail
Preview 1 out of 3 pages

TEC 226 ACCURATE STUDY GUIDE

Content preview

TEC 226 ACCURATE STUDY GUIDE

Public Works Project - Answers - Each party is clearly defined. Rigid or formal.

Private Sector - Answers - Close, lowest bidder or negotiate a price lower

Design Bid Build - Answers - General contract approach

Separate Contracts Method - Answers - Multiple prime contracts method, owner lets
contracts directly to contractors for portions of work, also if the owner has necessary in-
house capabilities to manage a construction project, assume greater risk than is
assumed with general contracts method

Self-performance Method - Answers - Project is small in scope, similar in character, and
ongoing in nature

Design-build Method - Answers - Owner lets a single contract for both the design and
construction of a project

Design-build reason - Answers - Fewer changes will arise during construction due to
designer error, construction can start before completion of the design for the project

CM at Risk - Answers - CM gives all their savings to the owner to ensure that the
interest of the owner are kept in focus

Bilateral Contract - Answers - Consists of an agreement created by mutual promises
made by the contracting parties.

5 Elements of a Contract - Answers - Offer and acceptance, meeting of the minds,
consideration, lawful subject matter, competent parties

Unreality of Consent - Answers - No meeting of the minds

Meeting of the Minds - Answers - Contracting parties agree on the basic meaning and
legal implications of the contract

Consideration - Answers - Something of value

Estoppel - Answers - Principle by which a contract becomes binding in spite of the fact
that no formal agreement was made between the parties concerned

Lien - Answers - Legal claim placed on a property, right to retain possession of the
property until a debt is satisfied

Document information

Uploaded on
August 5, 2026
Number of pages
3
Written in
2026/2027
Type
Other
Person
Unknown
$11.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
QUEENSEXAMS
4.1
(61)
Sold
230
Followers
180
Items
4957
Last sold
2 months ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions