CALIFORNIA C-50 REINFORCING STEEL CONTRACTOR LICENSE EXAMINATION COMPLETE VERIFIED QUESTIONS AND DETAILED SOLUTIONS LATEST UPDATE THIS YEAR JUST RELEASED

Document preview thumbnail
Preview 3 out of 25 pages

CALIFORNIA C-50 REINFORCING STEEL CONTRACTOR LICENSE EXAMINATION COMPLETE VERIFIED QUESTIONS AND DETAILED SOLUTIONS LATEST UPDATE THIS YEAR JUST RELEASED

Content preview

1|Page


CALIFORNIA C-50 REINFORCING STEEL
CONTRACTOR LICENSE EXAMINATION COMPLETE
VERIFIED QUESTIONS AND DETAILED SOLUTIONS
LATEST UPDATE THIS YEAR JUST RELEASED


The minimum width specified for a 2-lane overcrossing
structures shall be: - Answer-not less than 32 feet, face of
curb, to face of curb.


The minimum horizontal clearance to walls, such as
abutment walls, and retaining walls in cut locations
shall____________ - Answer-Not less than 10 feet


Minimum Vertical Clearance for Freeways and
Expressways, Overlay projects shall be: - Answer-16 feet


Concrete poured for curbs and sidewalks must
contain____________pounds of cement material per
cubic yard - Answer-463 lbs/cu yard. This concrete is
minor concrete

,2|Page


The specified spacing of construction joints for concrete
curbs and sidewalks where there is no adjacent curb
is________ - Answer-60'


While executing a contract the Contractor must furnish the
following document in writing - Answer-Test results


In a unit-priced based bid contract the billing is based on -
Answer-Items on which the work is done


The contractor needs to submit the detailed cost data for a
unit price adjustment for a bid item if - Answer-The
engineer requests the data.
You request a unit price adjustment resulting from a
change of more than 25% in the bid items quantity.
There is a major change in scope.


Critical Path Method is used to schedule the projects. This
is the path along which all the project activities have -
Answer-0 float


For areas that require pavement smoothness determined
using a 12 foot straightedge, the pavement surface must

, 3|Page


not vary from the lower edge of the straightedge by more
than: - Answer-0.01' when the straightedge is laid parallel
with the centerline.
0.02: when the straightedge is laid perpendicular to the
centerline and extends from edge to edge of a traffic lane.
0.02' when the straightedge is lad within 24' of a pavement
conform.


Clearing and grubbing consists of removing objectionable
material from - Answer-Construction area


Standards that are essential to produce a complete,
concise and legal set of project plans are - Answer-
Mandatory (shall and must)


Which are the factors used in determining the travel
width? - Answer-Traffic, present and future.
Number of lanes.
Terrain


The limiting axle load on a bridge with single axle
pneumatic tired truck with trailer is - Answer-28,000 lbs

Document information

Uploaded on
August 4, 2026
Number of pages
25
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$25.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Sold
80
Followers
6
Items
6052
Last sold
1 month ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions