Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 38 pages
Exam (elaborations)

CPIM COMPREHENSIVE OPERATIONS MANAGEMENT REVIEW SHEET FULL SOLUTIONS

Document preview thumbnail
Preview 4 out of 38 pages

CPIM COMPREHENSIVE OPERATIONS MANAGEMENT REVIEW SHEET FULL SOLUTIONS

Content preview

CPIM COMPREHENSIVE OPERATIONS
MANAGEMENT REVIEW SHEET FULL
SOLUTIONS

●● Advance ship notice (ASN)
Answer: Electronic data interchange (EDI) notification of shipment of
goods


●● Andon
Answer: Electronic board that provides visibility of floor status and
gives info to help coordinate efforts linked to work centers; green light =
running, red light = stop, yellow light = needs attention


●● Anticipation inventories
Answer: Any additional inventory above basic pipeline stock to cover
projected trends of increased sales, planned promo programs, seasonal
fluctuation, plant shutdowns, and vacations


●● Assemble-2-order
Answer: Production environment where a good or service can be
assembled after receipt of a customer's order. The key components (or
ingredients) used in assembly or finishing process are planned and
stocked in anticipation of a customer order. Receipt of order initiates

,assembly of the customized product. Useful strategy when a large
number of end products can be assembled from common components


●● Available inventory
Answer: On-hand inventory balance minus allocations, reservations,
backorders, and quantities held for quality problems


●● Backflush
Answer: Method of inventory bookkeeping where the book inventory is
automatically reduced after completion of activity on component's
upper-level parent item based on what should have been used as
specified on the BOM and allocation records; disadvantage is difference
between book inventory and physical OH inventory


●● Backhauling
Answer: Process of transportation returning from original destination
point to point of origin; can be full, partial, or empty load


●● Backlog
Answer: All customer orders received but not yet shipped (open orders
or order board)


●● Backorder

,Answer: Unfulfilled customer order or commitment. An immediate (or
past due) demand against an item whose inventory is insufficient to
satisfy the demand


●● Back scheduling
Answer: Technique for calculating operation start dates and due dates;
start with order due date and work backwards to calculate required start
date and/or due dates for each operation


●● Batch
Answer: Qty scheduled to be produced or in production; type of mfg
process used to produce items with similar designs & cover wide range
of order volumes; items ordered are of a repeat nature


●● Bill of lading
Answer: Document issued by a carrier which details a shipment of
merchandise and gives title of that shipment to a specified party.


●● Bill of material (BOM)
Answer: Listing of all the subassemblies, intermediates, parts, and raw
materials that go into a parent assembly showing the quantity of each
required to make an assembly; used in conjunction with the master
production schedule to determine the items for which purchase
requisitions and production orders must be released; list of all the
materials needed to make one production run of a product, by a contract
manufacturer, of piece parts/components for its customers

, ●● Bonded warehouse
Answer: Buildings or parts of a building designated by Sec of Treasury
for storing imported goods, operated under supervision of US Customs


●● Bottleneck
Answer: Facility, function, department, or resource whose capacity is
less than the demand placed upon it; machine or work center


●● Break-bulk
Answer: Dividing truckloads of similar items into smaller, more
appropriate qty's for use


●● Buffer
Answer: Qty of materials awaiting further processing; can refer to raw
materials, semi-finished stores or hold points, or a work backlog that is
purposely maintained behind a work center; in TOC, it can be time or
material and support thruput and/or due date performance maintained at
the constraint, convergent points (with a constraint part), divergent
points, and shipping points


●● Buffer management
Answer: In TOC, process where all expediting in a shop is driven by
what is scheduled to be in the buffers (constraint, shipping, or

Document information

Uploaded on
August 4, 2026
Number of pages
38
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$13.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
EddieJessup
3.5
(2)
Sold
20
Followers
1
Items
7989
Last sold
3 days ago


Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions