2021 NFPA99 Medical Gas Questions with Correct Answers

Document preview thumbnail
Preview 2 out of 12 pages

A manual reset local alarm that indicates when the capacity of the instrument air central supply system not in use is less than the equivalent capacity of - ANSWERSOne compressor After a final tie - In on an active vacuum system , each vacuum joints shall be tested with a leak detector or other means that will allow detectant on an active vacuum system . - ANSWERSUltrasonic After the final tie-in each joint shall be leak tested by the source gas. New work and the existing system at the normal operating pressure shall be leak checked with a leak detectant that is safe for use with oxygen and does NOT contain _______________ - ANSWERSAmmonia After the piping system, the blow down test shall be done. Then the installer must perform which of the following test? - ANSWERSInitial pressure test Alarm panels and shutoff valves labeling shall be ____________ when modifications are made, changing the areas serviced - ANSWERSUpdated All gas outlets with gauge pressure of 345 kPa (50 psi), including, but not limited to, oxygen, nitrous oxide, medical air, and carbon dioxide, shall deliver 100 SLPM (3.5 SCFM) with a pressure drop of not more than 35 kPa (______) and static pressure of 345 kPa to 380 kPa (50psi to 55 psi) - ANSWERS5 psi Area alarms shall be tested to verify the warning signals for all vital life support and critical care areas if the pressure in the piping system increases or decreases by _______ - ANSWERS20% At the sample port a demand of approximated 25% load shall be created to cause the compressors to cycle on and off continuously and the dryers to operate for the ______ period. - ANSWERS12 hour

Content preview

2021 NFPA99 Medical Gas Questions
with Correct Answers
A manual reset local alarm that indicates when the capacity of the instrument air central
supply system not in use is less than the equivalent capacity of - ANSWERSOne
compressor

After a final tie - In on an active vacuum system , each vacuum joints shall be tested
with a leak detector or other means that will allow detectant on an active vacuum
system . - ANSWERSUltrasonic

After the final tie-in each joint shall be leak tested by the source gas. New work and the
existing system at the normal operating pressure shall be leak checked with a leak
detectant that is safe for use with oxygen and does NOT contain _______________ -
ANSWERSAmmonia

After the piping system, the blow down test shall be done. Then the installer must
perform which of the following test? - ANSWERSInitial pressure test

Alarm panels and shutoff valves labeling shall be ____________ when modifications
are made, changing the areas serviced - ANSWERSUpdated

All gas outlets with gauge pressure of 345 kPa (50 psi), including, but not limited to,
oxygen, nitrous oxide, medical air, and carbon dioxide, shall deliver 100 SLPM (3.5
SCFM) with a pressure drop of not more than 35 kPa (______) and static pressure of
345 kPa to 380 kPa (50psi to 55 psi) - ANSWERS5 psi

Area alarms shall be tested to verify the warning signals for all vital life support and
critical care areas if the pressure in the piping system increases or decreases by
_______ - ANSWERS20%

At the sample port a demand of approximated 25% load shall be created to cause the
compressors to cycle on and off continuously and the dryers to operate for the ______
period. - ANSWERS12 hour

Before the piping system is put into use, who is responsible for the ascertaining that the
gas delivered to the outlet/inlet has the proper labels and connecting fittings. -
ANSWERSFacility authority

Breached portions of the systems subject to inspection and testing shall be confined to
only the specific altered zone or area that is downstream for pressure gases at the point
of intrusion. Where a system shall be declared breached? - ANSWERSPhysical

, separation of pipeline, system component removal, replacement or addition of system
components

Category 2 & 3 medical has and vacuum systems are allowed to be ________ on the
amount of compressors and vacuum pumps - ANSWERSSimplex

Category 2 oxygen piping shall be at least 1 size larger than piping for _______? -
ANSWERSNitrous oxide

Category 3 gas-power device supply systems, vacuum systems and scavenging
systems. The initial tests shall be performed before the final tests shall be conducted by
______. - ANSWERSInstaller, representative of the system manufacturer, medical gas
system verifier 6030

Category 3 piped gas and vacuum systems only ______ shall be permitted. -
ANSWERSMinimal or no sedation

Category 3 vacuum source equipment shall be obtained from, and be installed under
the supervision of the __________? - ANSWERSManufacturer, supplier, who is familiar
with its installation, operation and use

Category 2 & 3 medical gas systems are required to have how many alarm panels? -
ANSWERS1

Cylinders in service and in storage shall be __________ secured and located to prevent
falling or being knocked over. - ANSWERSIndividually

Dental air sources for a compressor intake located inside the building shall be located
within a space where no _______ are stored or used. - ANSWERSChemical based
materials, patient medical treatment, discharge from category 3 vacuum system

Dental applications that use flexible connectors shall have a gauge pressure rating not
less than _______ - ANSWERS1000 psi

Distribution piping for support gas systems (nitrogen and instrument air) shall be
________ type "L" copper tube - ANSWERSASTM B819

During the initial pressure test, the source shutoff valve shall remain closed and the test
pressure for pressure gases shall be 1.5 times the system working pressure, but not
less than ______ - ANSWERS150 psi

Each health care facility shall designate one or more individuals to be the _______ with
respect to the facility's medical gas and vacuum systems. - ANSWERSResponsible
facility authority

Document information

Uploaded on
August 4, 2026
Number of pages
12
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$12.29

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
4
Followers
0
Items
1470
Last sold
1 month ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions