What two plans in the SWPPP Erosion and sediment control plans and
must be approved? stormwater management plans must be
approved.
Does the stormwater The stormwater management plan addresses
management plan address runoff post-construction stormwater runoff.
during construction or after?
What impact does impervious The volume and velocity of stormwater runoff
cover have on water quality? increases as natural vegetation is replaced
with roads, buildings, parking areas and other
impervious surfaces. The increase in
stormwater runoff leads to an increase in
pollutants, such as sediment and phosphorus
that are carried to waterways, which has a
negative effect on water quality.
, What is the target pollutant in the Phosphorus
water quality criteria ?
What is the lower limit of the 10%
range of imperviousness that
scan result in stream
degradation?
The SWM regulation ensures Channel erosion and flooding.
water quantity is considered in
stormwater management
planning to protect against
which two destructive forces?
Discuss how the rate of runoff The rate of runoff increase after
changes after development. development because of the replacement of
vegetation with impervious surfaces. A
larger volume of water will travel more
quickly through a stream channel,
potentially causing erosion and flooding.
A locality VSMP must be at least Construction GP (9VAC25-870-106).
as stringent as what state
permit?
What plans must a locality's ESC plan and SWM plan (9VAC25-870-148)
ordinance require to be
submitted and approved?