• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 3 out of 29 pages
Exam (elaborations)

MOS 3330 Operations Management Complete Midterm & Final Exam Q&A Bundle | Western University| 2026/2027 | Verified Answers | Graded A+

Document preview thumbnail
Preview 3 out of 29 pages

Looking for MOS 3330 Operations Management midterm and final exam questions with answers? This document contains a complete collection of exam-style questions and detailed answers designed specifically for MOS 3330 / MOS 3330A / MOS 3330B at Western University (UWO), King’s University College, and Huron. The package focuses on the most important topics tested in both the midterm and final exams, including: Introduction to Operations Management Supply Chain Management Inventory Management Forecasting Capacity Planning & Constraint Management Aggregate Planning MRP & ERP Scheduling & Sequencing Process and Product Design Just-in-Time (JIT) and Lean Operations Total Quality Management (TQM) and Six Sigma Each question is accompanied by clear, well-explained answers so you can understand the reasoning and apply the concepts under exam conditions. Ideal for last-minute review, practice, and identifying high-yield topics. Perfect for BMOS students who want real exam-style practice for both the midterm and final. Download now and walk into your MOS 3330 exams fully prepared.

Content preview

MOS 3330 – Exam
Operations Management




1. The welding department supplies parts to the final assembly line.
Management decides to implement a kanban system and has collected
the following data.
 The daily demand is 2,200 units.
 The production lead time is 2 days (this includes processing time,
transport time, and waiting time).
 Management has decided to have 1 day(s) of safety stock
 One container fits 475 units


Answer:
We first determine the amount of demand during the production lead time.

Demand during lead time = Lead time × Daily demand = 2 days × 2,200 units / day = 4,400 units

We translate the 1 day safety stock into a quantity, which is 1 day(s) × 2,200 units / day = 2,200
units.

With 6,600 units and a container size of 475 units / container, we need:

Number of kanban containers = (Demand during lead time + Safety stock) / Container size =
(4,400 + 2,200) / 475 = 6, = 14

So, we need 14 containers.


2. A copy machine is available 24 hours a day. On a typical day, the
machine produces 113 jobs. Each job takes about 4 minutes on the
machine, 2 minutes of which is processing time and 2 minute is setup
time (logging in, defining the job). About 16 Percent of the jobs need to
be reworked, in which case the setup time and the processing time have
to be repeated. The remainder of the time, the equipment is idle. What is
the OEE of the equipment?



Answer:
The copy machine is available 60 × 24 = 1440 minutes a day. The value add time is 226 minutes.
So, the OEE is:

,OEE = Value add time / Time available = 226 / (24 × 60) = 15.7.




3. In the welding operations of a bicycle manufacturer, a bike frame has a
flow time of about 13.75 hours. The time in the welding operation is
spent as follows: 3 hours waiting in front of the cutting machine for the
batch to start, 1 hours waiting for the setup of the machine, 2 hour
waiting for the other pieces of the batch to go through cutting, 2 minute
at the cutting machine, and 3 hours waiting for the transfer to the
welding machine. Then, at the welding machine, the unit spends 1 hour
waiting in front of the welding machine for the batch to start, 2 hour
waiting for the setup of the welding machine, 0.75 hour waiting for the
other pieces of the batch to go through welding, 0.4 minute at the
welding machine, and 1 hour waiting for the transfer to the next
department.



Answer:
The exact flow time is 827.40 minutes. Of this, only 2.4 minutes are value-added time. Thus, the
percentage of value-added time is:

Value-added time of the flow unit / Flow time = 2.4 minutes / 827.40 minutes = 0.002901 =
0.2901%


4. A process makes two products, A and B and operates 5 days per
week, 8 hours per day. Demand for the two products for the next
week is as follow:

Day 1: A: 20 B: 26
Day 2: A: 10 B: 15
Day 3: A: 20 B: 19
Day 4: A: 18 B: 20
Day 5: A: 12 B: 20



Answer:


The total demand across both products is 180 units that we have to process over the
course of the 40 hour work week. So, the takt time would be:

, Takt time = Available time / Demand = 40 hours / 180 units = 0.22222 hours / unit

A level production schedule would almost alternate between A and B as follows:
ABABABABB ABABABABB… This puts the flow-units in a relationship of 8:10, as is the
overall demand mix.




5. Consider again that the company making tires for bikes is concerned
about the exact width of its cyclocross tires. The company has a lower
specification limit of 22.5 mm and an upper specification limit of 23.1
mm. The standard deviation is 0.20 mm and the mean is 22.80 mm.

What is the probability that a tire will be too narrow?
What is the probability that a tire will be too wide?
What is the probability that a tire will be defective?


Answer:
a..
Probability{too narrow} = NORM.DIST(22.5, 22.8, 0.2, TRUE) = 0.066807

b.
Probability{too wide} = 1 − NORM.DIST(23.1, 22.8, 0.2, TRUE) = 0.066807

c.
Probability{part defective} = 0.066807 + 0.066807 = 0.133614

Document information

Uploaded on
August 4, 2026
Number of pages
29
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$10.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Sold
0
Followers
0
Items
25
Last sold
-




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions