Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 10 pages
Exam (elaborations)

Virginia DEQ Stormwater Management (SWM) Inspector Exam 2026/2027 – Comprehensive Questions and Answers Study Guide

Document preview thumbnail
Preview 2 out of 10 pages

Comprehensive study guide for the Virginia DEQ Stormwater Management (SWM) Inspector certification exam covering Virginia Stormwater Management Program (VSMP) requirements, construction general permits, SWPPP, inspections, BMPs, runoff reduction, erosion and sediment control, water quality standards, permit compliance, and regulatory requirements. Includes verified practice questions and detailed answers designed to help prepare for state stormwater inspector examinations and field inspections.

Content preview

VA DEQ SWM Inspector Exam comprehensive questions and
verified answers ACTUAL EXAM 2026 TEST!! Graded A+ ||2026
EXAM UPDATE

Terms in this set (63)



What element is targeted by Phosphorous, it indicates pollution by bonding
water quality criteria? with other pollutants.

At what % impervious cover are 25%
streams substantially affected?

what is the site-based load limit 0.41 lbs/acre/yr total phosphorous
for water quality?

, Virginia Runoff Reduction load calculations based on land cover type and
Method- method of load soil type.
calculations

what must happen to Must be diverted to stormwater conveyance
potentially harmful sheet flow system.
runoff?

SWM ponds must be able to must be able to safely convey up to a 100 yr
convey water safely up to what storm.
level storm event?

Define LDA Land disturbing activity; any man-made change
to the land surface that
potentially changes its runoff characteristics;
includes clearing, grading, and excavation.

What size LDA must comply anything of 1 acre or more, or 2500 ft^2 in
with stormwater management CPBA areas; may be more stringent locally.
regulation? in CPBA areas?

what are some activities exempt mining, agriculture, sewer discharges, local
from SWM regulations? reclamation programs, routine maintenance of
preexisting operations, public emergency
activity

what term basically means a consent order, which replaces penalties with
plea deal for stormwater fines.
offenders?

how long does VSMP authority 15 days to review and determine approval, and
have to review SWM plan? notify applicant.

Document information

Uploaded on
August 1, 2026
Number of pages
10
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$13.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
NurseAdvocate
4.5
(248)
Sold
542
Followers
77
Items
12280
Last sold
7 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions