• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 15 pages
Exam (elaborations)

CEPSCI PRACTICE TEST || 100% Correct Answers.

Document preview thumbnail
Preview 2 out of 15 pages

CEPSCI PRACTICE TEST || 100% Correct Answers.

Content preview

CEPSCI PRACTICE TEST || 100% Correct Answers.


Administered by the US environmental protection agency (EPA) Created the NPDES correct
answers 1972 clean water act


Amendment to CWA CALLED WATER QUALITY ACT correct answers 1987


South Carolina is NPDES delegated state. correct answers NPDES in south carolina


SCDHEC correct answers NPDES regulations are administered by


stormwater discharges from construction sites correct answers CGP authorizes


land disturbing activities greater than or equal to 1 acre
-land disturbance less than 1 ac within 1/2 miles of water body in SC costal zone correct answers
Who must obtain NPDES coverage


operator-person or company for a particular discharge correct answers NPDES permits are issued
to


-has day to day operational control to ensure compliance with SWPP
-typically the owner or developer correct answers primary permittee


submit NOI, Preparation of the C_SWPPP correct answers primary permittee responsibilites


individual lot owner or residential builder that conducts land disturbing activity limited to an
individual lot or group of lots as part of approved LCP of development correct answers
Secondary permittee

, must on Contractor Certification- D-0437 correct answers contractors


SCDHEC CGP, NOI, NPDES coverage approval letter, Contractor Certifications, Local
Approvals, USACE approvals, Critical area permit(coast) correct answers On-Site SWPPP


a copy of signed and certified SWPPP, NOI, and CGP coverage letter from DHEC must be
retained at site or electronically accessible correct answers OS_SWPPP


minor modifications made directly in the field,do not need approval by DHEC- additional
BMP's, removal of disturbed areas correct answers minor modification to ON-SWPPP


must be made by qualified individual and submitted to DHEC or appropriate delegated entity for
approval correct answers major modifications to OS-SWPPP


include a phased stormwater management plan which identifies all BMP's and grading work
conducted during a specific portion of the sites construction sequence. Each phase identified on
at least one separate plan sheet. correct answers Phased plan requirement > 5


at least two separate plan phases are required - initial land disturbance phase - stabilization phase
correct answers Phased plan requirement < 10 but > 5 acres


at least 3 separate plan phases are required - initial land disturbance phase - construction phase -
stabilization phase correct answers Phased plan requirement ≥ 10 acres


1. areas of site disturbed by construction activity and areas used for storage of materials exposed
to precipitation
2. stormwater conveyance systems for evidence of sediment
3. BMP's identified in OS-SWPPP
4. Discharge location to investigate if sediment leaving site, or if such locations are inaccessible,
nearby downstream location if possible.

Document information

Uploaded on
August 1, 2026
Number of pages
15
Written in
2026/2027
Type
Exam (elaborations)
Contains
Questions & answers
$12.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
SirAnton
3.7
(118)
Sold
802
Followers
438
Items
40094
Last sold
4 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions