TEST BANK: Texas Housing
Authority Maintenance
Supervisor
PART 0: THE TABLE OF CONTENTS
Section Cognitive Tier Focus Area Page/Section
Reference
PART I The Preview Critical Axioms & Core Section I
Frameworks
PART II Tier 1 Foundational Syntax & Section II.1
Application (Q1–Q10)
PART II Tier 2 Complex Application & Section II.2
Simulation (Q11–Q20)
PART II Tier 3 Grandmaster Synthesis Section II.3
(Q21–Q30)
PART I: THE PREVIEW
Mastering this test bank elevates a maintenance professional from a reactive task-manager to a
strategic, legally compliant operator capable of safeguarding assets, funding, and human life. By
internalizing these cross-disciplinary frameworks, the practitioner will effortlessly navigate the
high-stakes intersections of Texas state law, federal Department of Housing and Urban
Development (HUD) regulations, and life-safety engineering.
● The Davis-Bacon Threshold: Any federally funded construction, alteration, or repair
contract exceeding $2,000 mandates prevailing wages. Routine maintenance performed
by force account (in-house) labor is exempt.
● The Procurement Hierarchy: Bid-splitting is illegal. Micro-purchases (up to $10,000)
require one reasonable quote; Small purchases (up to $100,000 per Texas Local
Government Code) require at least three quotes; amounts over $100,000 mandate formal
Sealed Bidding (IFB) or Competitive Proposals (RFP).
● The NSPIRE Life-Threatening (LT) 24-Hour Rule: Deficiencies presenting a high risk of
death or severe injury—including blocked egress, missing smoke/carbon monoxide
alarms, unvented gas heaters, interior temperatures below 64°F (Oct 1–Mar 31), mold
greater than 9 square feet in a unit, and missing guardrails at 30-inch drop-offs—MUST
be corrected within 24 hours.
● The Texas Maintenance Exemption Boundary: Unlicensed in-house maintenance
, personnel may perform basic plumbing and HVAC upkeep, but CANNOT legally replace
gas-fired water heaters (requires Texas State Board of Plumbing Examiners license) or
perform full system installations on new construction or refrigerant circuits without
supervision (requires Texas Department of Licensing and Regulation Air Conditioning and
Refrigeration license).
● The Chapter 92 Rebuttable Presumption: Under the Texas Property Code, landlords
have a presumed seven days to repair conditions materially affecting health and safety
after receiving proper notice, failure of which triggers the tenant's repair-and-deduct or
lease-termination remedies.
PART II: THE ELITE TEST BANK
Tier 1: Foundational Syntax & Application
Q1: A public housing tenant in Texas submits a written work order regarding a complete loss of
hot water in their unit. The tenant is current on rent. Based on the principles of the Texas
Property Code Chapter 92, which action/conclusion is the MOST ACCURATE regarding the
authority's legal obligation to repair? A) The landlord has a strict, non-negotiable 72-hour
window to restore the hot water before the tenant can legally terminate the lease. B) The
landlord has a rebuttable presumption of seven days to make a diligent effort to repair the
condition. C) The landlord is not liable for repairs unless the tenant has submitted the work
order via certified mail with a return receipt requested. D) The landlord may require the tenant to
pay for the hot water heater repair if the lease explicitly transfers all maintenance duties to the
tenant.
● The Answer: B (The landlord has a rebuttable presumption of seven days to make a
diligent effort to repair the condition.)
● Distractor Analysis:
○ A is incorrect: While local codes may require faster action, Chapter 92 establishes a
presumptive seven-day window as a reasonable time to repair conditions affecting
physical health or safety, not a strict 72-hour limit.
○ C is incorrect: The initial notice does not require certified mail to trigger the duty to
repair, though certified mail eliminates the need for a subsequent written notice
before a tenant can exercise judicial remedies.
○ D is incorrect: A landlord cannot waive their statutory duty to repair conditions
affecting health and safety in a multi-unit housing project; waivers are strictly limited
to single-dwelling owners under highly specific conditions.
The Mentor's Analysis: A tenant's statutory right to a safe, habitable environment forms the
foundation of Texas landlord-tenant jurisprudence. When facing a loss of essential services like
hot water, the immediate priority is demonstrating a diligent effort to repair within the
presumptive seven-day window. By utilizing the rebuttable presumption standard, the
practitioner bypasses the common trap of assuming all repairs require instantaneous
completion, allowing legal leeway for parts and labor acquisition. Professional/Academic
Intuition: Always meticulously document the timeline of repair efforts; a logged "diligent
effort" serves as the primary legal shield against Chapter 92 liability.
Q2: A maintenance supervisor needs to procure a specific commercial-grade drain cleaning
machine. The total cost is estimated at $8,500. Based on the principles of HUD Procurement
Handbook 7460.8 REV 2 and federal guidelines, which action is the MOST ACCURATE
, procurement method? A) The supervisor must publish a formal Invitation for Bids (IFB) because
the item is commercial equipment. B) The supervisor must obtain a minimum of three written
quotes because the purchase exceeds the $2,000 Davis-Bacon threshold. C) The supervisor
may proceed with a single quote provided the price is considered reasonable, utilizing
micro-purchase procedures. D) The supervisor must perform a formal cost/price analysis and
submit it to the Board of Commissioners for prior approval.
● The Answer: C (The supervisor may proceed with a single quote provided the price is
considered reasonable, utilizing micro-purchase procedures.)
● Distractor Analysis:
○ A is incorrect: Formal sealed bidding (IFB) is only required when procurement
exceeds the small purchase threshold, currently $100,000 under Texas Local
Government Code.
○ B is incorrect: The Davis-Bacon $2,000 threshold applies strictly to federal
construction contracts involving laborers and mechanics, not the procurement of
off-the-shelf equipment.
○ D is incorrect: A formal independent cost estimate (ICE) and Board approval are not
required for standard micro-purchases under $10,000, though the Contracting
Officer must affirm the price is reasonable.
The Mentor's Analysis: Procurement efficiency is critical to maintaining operational momentum
in property management. When facing purchases under $10,000, the immediate priority is
securing the goods rapidly while maintaining ethical pricing standards. By utilizing
micro-purchase procedures, the professional bypasses the common trap of over-complicating
low-dollar acquisitions with unnecessary administrative burdens.
Procurement Type Financial Threshold Minimum Requirement
Micro-Purchase Up to $10,000 1 reasonable quote
Small Purchase $10,001 to $100,000 3 competitive quotes
Formal Bidding Over $100,000 Sealed IFB / RFP
Professional/Academic Intuition: Micro-purchases under $10,000 require only one quote
if the price is market-reasonable, accelerating facility maintenance workflows.
Q3: During an annual unit inspection, a supervisor notes that the sleeping room's primary
rescue window is blocked by a heavy, immovable bookcase. Based on the principles of HUD's
NSPIRE standards, which conclusion is the MOST ACCURATE regarding this deficiency? A) It
is a Low deficiency that must be corrected within 60 days to prevent habitability degradation. B)
It is a Moderate deficiency requiring a 30-day corrective action plan submitted to HUD. C) It is a
Severe deficiency requiring remediation within 30 days because it affects property security. D) It
is a Life-Threatening deficiency requiring correction within 24 hours.
● The Answer: D (It is a Life-Threatening deficiency requiring correction within 24 hours.)
● Distractor Analysis:
○ A is incorrect: Blocked egress in a sleeping room presents an immediate risk of
death in a fire, far exceeding the criteria for a Low (advisory) deficiency.
○ B is incorrect: Egress obstruction is not moderate; it directly compromises life safety
and evacuation protocols.
○ C is incorrect: While Severe deficiencies can carry 24-hour or 30-day timelines, an
obstructed rescue opening in a sleeping room is explicitly categorized under
NSPIRE as a Life-Threatening condition demanding a 24-hour response.
The Mentor's Analysis: Unobstructed egress is the ultimate fail-safe in fire safety engineering.
When facing blocked rescue openings, the immediate priority is clearing the pathway to ensure