Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 5 pages
Exam (elaborations)

OPMA 317 03 - PROJECT MANAGEMENT AND SCHEDULING QUESTIONS WITH VERIFIED ANSWERS

Document preview thumbnail
Preview 2 out of 5 pages

OPMA 317 03 - PROJECT MANAGEMENT AND SCHEDULING QUESTIONS WITH VERIFIED ANSWERS

Content preview

OPMA 317 03 - PROJECT MANAGEMENT AND
SCHEDULING | QUESTIONS WITH VERIFIED
ANSWERS


project - Answers - A series of related jobs usually directed toward some major output
and requiring a significant period of time to perform.

project planning - Answers - Planning, directing, and controlling resources (people,
equipment, material) to meet the technical, cost, and time constraints of a project.

what are the two broad categories of projects? - Answers - - conventional (low-tech)
- innovative (high-tech)

conventional (low-tech) projects - Answers - - "repetitive projects"
- a lot of certainty
- tasks, sequence, durations, and resource requirements are known
- tested methods are preferred

examples of conventional projects - Answers - - home construction
- financial audit
- oil well drilling

innovative (high-tech) projects - Answers - - "unique projects"
- a lot of uncertainty; must be managed differently
- non-linear progress, and iterations; change is normal
- flexible plans

examples of innovative projects - Answers - - new product development
- unique buildings

"scrum" projects - Answers - scrum = framework for addressing complex adaptive
problems
- small teams, 'time-boxed' iterations (sprints around 2 weeks), daily short meetings
(scrums) to track progress and re-plan, 'customer' input
- used in a variety of projects however heavily used in software development

triple bottom line - Answers - A business strategy that includes social, economic, and
environmental criteria.
- people, planet, profit

What criteria should be used to evaluate if a project has been "successful"? - Answers -
1. cost: did actual expenses exceed project budget?

, 2. time: was the project completed on schedule?
3. quality: did the project deliver what it promised?
4. environmental: how were environmental concerns addressed?
5. social: how were people (stakeholders) impacted by project?
6. (an unsaid criteria because it is a given) - safety: if you have a project where people
were injured or killed, it is immediately a failure

the project life cycle - Answers - - identify a need (ex. send request for proposal [RFP]
to vendor)
- develop a proposed solution: design determined/selected
- perform the project (most effort and money spent in this phase); implementation
- terminate the project: close activities (handoff), "audit" for learning

project planning & control - Answers - a project manager constantly REplans,
REschedules, and REallocates resources as a project progresses
- control should include recording reasons for differences to budget/schedule/quality

project management triangle - Answers - - three elements schedule (time), cost, and
scope; quality is not a variable because we never want to trade off quality; ex. lower
cost should not mean lower quality
-a project change in one area will impact the others
- tool is used to help manage changes during project

impact on the triangle if we want to complete a project faster (Schedule decrease) -
Answers - - cost increase: overtime, expediting, etc.
- scope decrease: reduce activities to complete faster

impact on the triangle if we want to cut budget (cost decrease) - Answers - - schedule
increase: cannot afford overtime, expediting, etc.
- scope decrease: reduce activities to save money

impact on the triangle if we want to complete additional activities (increase scope) -
Answers - - cost increase: more labour, materials, equipment, etc.
- schedule increase: more activities means project will take longer

risk premium - Answers - the amount paid to avoid risk
- for projects, additional expenses incurred to ensure flexibility; the project progresses,
but flexibility is maintained for a cost

Dual Development Strategy - Answers - requires extra engineering and extra tasks
which may not even be used, but can still buy you time and reduce risk

Work Breakdown Structure (WBS) - Answers - - a hierarchical breakdown of what is to
be accomplished during the project
- facilitates the planning, budgeting, scheduling and control for the project manager
- the heart of project management

Document information

Uploaded on
July 31, 2026
Number of pages
5
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$12.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
GEEKA
3.8
(362)
Sold
2144
Followers
1448
Items
59116
Last sold
20 hours ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions