,design and construction The building's ____________________________ is a process
that begins as an idea and ends with a
substantial structure
Design Principles: Guidelines applied to basic units of a project
that cause the items to work together as a
unified, completely finished item that serves a
purpose within established parameters.Units can
include the materials, concepts and settings.
Design build firm A _____________________ is usually a general contractor
wit architects and engineers on staff.
Buildings _____________________ are a composite of many diverse
elements and systems that are designed with a
purpose.
Building Code: A set of rules developed by a standards
organization and adopted as law by a
governmental body to regulate the minimum
requirements for construction, renovation, and
maintenance of buildings.
,Building permit: Authorization issued from the appropriate
authority having jurisdiction before any new
construction, addition, renovations, alterations,
or demolition of buildings or structures occurs.
permitting Fire officials may be actively involved in the
__________________ process in some jurisdictions.
Board of appeals: Group of people (5-7) with experience in fire
prevention, building construction, and/or code
enforcement, who are legally constituted to
arbitrate differences of opinion between fire and
building officials, property owners, occupants or
builders.
Identifying and correcting _______________________________ before construction starts
improves efficiency and cost effectiveness.
Fast-Track construction: Strategy to reduce the overall time for
completion of a project by merging the design
and construction phases. Often used in
conjunction with design-build.
, inspections ___________________ take place during construction
and upon a project's completion to ensure that
proper materials and construction techniques
are used.
structural failure Seemingly minor changes to an architects or
engineers plans may directly cause or contribute
to ____________________________________.
Preincident surgery: Assessment of a facility or location made before
an emergency occurs, in order to prepare for an
appropriate emergency response. Also known
as a Preplan.
Preincident planning: Act of preparing to manage an incident at
particular location or a particular type of
incident before an incident occurs. Also know as
Prefire inspection, Prefire planning, pre incident
inspection, Preincident survey, or preplanning
International Existing Building code Determines the extent of work in relation to the
(IEBC): building as a whole, which may range from from
repairs, renovations, change of occupancy, and
building additions.