Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 56 pages
Exam (elaborations)

PJM PAPER STUDY GUIDE QUESTIONS AND VERIFIED ANSWERS..

Document preview thumbnail
Preview 4 out of 56 pages

PJM PAPER STUDY GUIDE QUESTIONS AND VERIFIED ANSWERS

Content preview

What is the most critical communication path when restoring large load blocks early
in a System Restoration?


Give this one a try later!


Between the Generating Unit and the Transmission Owner




Which of the following statements about cyber clean code/devices and the
processes of cleaning are true?


Give this one a try later!


If a cyber issue is found and a way to address the issue is not known, it's
important to isolate the code/device so it doesn't get worse, or spread the
issue elsewhere.

When a cyber issue is found it is of paramount importance to not only

, ensure the code/device is clean but the method of infection discovered
and addressed.




Which of the following is true for a Price based unit that opted-in to intraday offers
and is currently in a commitment:


Give this one a try later!


. Can decrease the price based offer up to 65 minutes before the start of
the operating hour




PJM has called Max Emergency Gen into the capacity for the operating day. What
total Operating Reserve value should be reported for an IRC under these conditions?


Give this one a try later!


255 mw




By what hour must resolutions for the TODAY Report in Gen Checkout be handled


Give this one a try later!


04:00




Underthe National Terrorism Advisory System (NTAS) there are 2 types of alerts:
Elevated Threat Alert and ______

,Give this one a try later!


Imminent Threat Alert




Which statement is true concerning the Fixed Resource Requirement (FRR)
Alternative?


Give this one a try later!


The LSE avoids direct participation in RPM Auctions




The main purpose of Under-Frequency Load Shed relaying is to:


Give this one a try later!


Arrest the decline of frequency




What is the Primary Reserve Requirement based on?


Give this one a try later!


150% of the real-time largest single contingency




Which of the following loads are considered as "critical load" by PJM?


Give this one a try later!

, Gas infrastructure




Which of the following values have to be implemented before allowing energization
of cut-in equipment? (select 3)
A. Impedances
B. Voltage Profile
C. Contingency Definitions
D. Congestion Priority


Give this one a try later!


A,C,D




Your system has a 450 MW steam capacity, 670 MW of combustion turbine capacity
and 125 MW of hydro capacity with load pick-up factors of 5%, 25% and 15%
respectively. 70 MW of load with under-frequency relays has also been picked-up.
The largest contingency is CT unit with 150 MWs of capacity. Determine the amount of
dynamic reserve:


Give this one a try later!


241.25 MW




For real-time changes in Reactive Capability, The GO/MOC should submit an updated
D-curve via eDART and ______


Give this one a try later!

Document information

Uploaded on
July 28, 2026
Number of pages
56
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$10.50

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
BestKey
4.3
(116)
Sold
278
Followers
108
Items
8363
Last sold
1 week ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions