Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 3 out of 29 pages
Exam (elaborations)

PJM TERMS QUESTIONS AND VERIFIED ANSWERS..

Document preview thumbnail
Preview 3 out of 29 pages

PJM TERMS QUESTIONS AND VERIFIED ANSWERS

Content preview

Design-assist contracting


Give this one a try later!


best for complexity
- specialty contractors are included early in the design phase to develop
and draw complex or proprietary contrition details




B214-2012


Give this one a try later!


Standard form of architect services: LEED Certification

,additional services


Give this one a try later!


services added after the contract is signed for work that is not covered
initially under basic or supplemental services or supplemental changes to
the project schedule or budget. this may include:
- failure of performance by owner or owner consultants
- public presentations, meetings, or hearings/ dispute resolution
- preparing digital models for owner consultants
- public presentations, meetings, or hearings/ disputes resolutions
- evaluation extensive number of claims
- out of sequence submittal review
- substituting from owner or contractor that entail changing the
construction drawings




consensus docs


Give this one a try later!


set of contracts developed by contractor and trade groups to end what
they see as a bias towards the architect in the AIA contracts




float


Give this one a try later!

, the amount of time a task can be delayed without causing delay to
subsequent tasks. an activity float can be started or finished within range of
time prior to project completion date without affecting the overall
schedule




Article 4: Supplemental Services


Give this one a try later!


supplemental services and additional services




bridging design-build


Give this one a try later!


best for risk and quality
- architect/ engineer hired as consultant at start of process:
- A/E develops project requirements, preliminary scope drawings
- A/E hires design build firm to take over project
- A/E reviews work of Design Build firm behalf of owner




Article 6: Cost of work


Give this one a try later!

Document information

Uploaded on
July 28, 2026
Number of pages
29
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$10.50

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
BestKey
4.3
(116)
Sold
278
Followers
108
Items
8363
Last sold
1 week ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions