to meet the Transmission Operator's individual restoration plant, the Generation
Operator shall notify the Transmission Operator of the known changes within.
A) 4 hours
B) 8 hours
C) 16 hours
D) 24 hours
Give this one a try later!
24 hours
What is the penalty for Units that do not meet their slated reactive capability testing
Give this one a try later!
, there is no penalty
With whom does PJM share the results of generation reactive capability tests?
Give this one a try later!
The affected TO
Warning issued when synch reserve requirements are less than synch reserve
requirement
Give this one a try later!
Voltage reduction warning and Reduction of of Non-critical plant load.
During a suspected terrorism or sabotage event, PJM puts emphasis on what aspects
of operation?
Give this one a try later!
Operation and Communication
A Geomagnetic Disturbance Warning issued by PJM when the NOAA has issued a
warning or an alert for a potential GMD storm of what severity?
Give this one a try later!