ISQS 3344 Exam 1 Questions and Answers with Verified Solutions |
Latest 2026 Update
Q: Capacity Planning
Answer:
The process of establishing the output rate that may be needed at a
facility.
Q: Capacity is purchased in chunks
Answer:
Q: Capacity Planning: Andover Togs
Answer:
a) made products for Walmart
b) behind on inventory and didn't have capacity in facility to finish them on time
before the end
of the period
c) suggested 2nd flood for offices and free up space
d) boss gets fired and Walmart didn't buy from them
e) plant closed
f) Issue: bad communication and wasted a lot of money
,ISQS 3344 Exam 1 Questions and Answers with Verified Solutions |
Latest 2026 Update
Q: Capacity Measurement a) Design/theoretical capacity- maximum output rate
under ideal conditions (over time) 1)"What happens when you run at a high
theoretical capacity?
Answer:
" -employers take off because they are tired and sick. If you run your equipment long
and hard it will eventually break.
Q: 2) Quiz Question: "Theoretical capacity is:" -maximum output under ideal
conditions (OT, etc.)
Answer:
Q: b) Effective Capacity- maximum output rate under REGULAR operating
conditions (40hrs/week and normal effort) 1) "What is the main reason to track
capacity?
Answer:
" -you may be overworking people and you don't even know it.
,ISQS 3344 Exam 1 Questions and Answers with Verified Solutions |
Latest 2026 Update
Q: Measuring Capacity: UPS
Answer:
a) Measured capacity by the number of stops drivers made
Q: b) began on east/west coast expanded to Houston
Answer:
Q: c) When they moved to Houston they had to change their measurement of
capacity from stops
Answer:
per day to miles driven
Q: Measuring Capacity: Nutmeg Mills
Answer:
a) Couldn't measure capacity and came up with a formula
that calculated the number of stiches per hour
, ISQS 3344 Exam 1 Questions and Answers with Verified Solutions |
Latest 2026 Update
Q: b) This wasn't accurate and was a disaster at measuring capacity
Answer:
Q: c) This is an example that to measure capacity your method has to be simple and
accurate
Answer:
Q: Capacity Utilization and Efficiency
Answer:
a) Measures how much of the available capacity is
actually being used and efficiency in comparison to effective capacity:
Q: b) Design Capacity Utilization = (actual output rate) ÷ (design capacity) x 100%
Answer:
Latest 2026 Update
Q: Capacity Planning
Answer:
The process of establishing the output rate that may be needed at a
facility.
Q: Capacity is purchased in chunks
Answer:
Q: Capacity Planning: Andover Togs
Answer:
a) made products for Walmart
b) behind on inventory and didn't have capacity in facility to finish them on time
before the end
of the period
c) suggested 2nd flood for offices and free up space
d) boss gets fired and Walmart didn't buy from them
e) plant closed
f) Issue: bad communication and wasted a lot of money
,ISQS 3344 Exam 1 Questions and Answers with Verified Solutions |
Latest 2026 Update
Q: Capacity Measurement a) Design/theoretical capacity- maximum output rate
under ideal conditions (over time) 1)"What happens when you run at a high
theoretical capacity?
Answer:
" -employers take off because they are tired and sick. If you run your equipment long
and hard it will eventually break.
Q: 2) Quiz Question: "Theoretical capacity is:" -maximum output under ideal
conditions (OT, etc.)
Answer:
Q: b) Effective Capacity- maximum output rate under REGULAR operating
conditions (40hrs/week and normal effort) 1) "What is the main reason to track
capacity?
Answer:
" -you may be overworking people and you don't even know it.
,ISQS 3344 Exam 1 Questions and Answers with Verified Solutions |
Latest 2026 Update
Q: Measuring Capacity: UPS
Answer:
a) Measured capacity by the number of stops drivers made
Q: b) began on east/west coast expanded to Houston
Answer:
Q: c) When they moved to Houston they had to change their measurement of
capacity from stops
Answer:
per day to miles driven
Q: Measuring Capacity: Nutmeg Mills
Answer:
a) Couldn't measure capacity and came up with a formula
that calculated the number of stiches per hour
, ISQS 3344 Exam 1 Questions and Answers with Verified Solutions |
Latest 2026 Update
Q: b) This wasn't accurate and was a disaster at measuring capacity
Answer:
Q: c) This is an example that to measure capacity your method has to be simple and
accurate
Answer:
Q: Capacity Utilization and Efficiency
Answer:
a) Measures how much of the available capacity is
actually being used and efficiency in comparison to effective capacity:
Q: b) Design Capacity Utilization = (actual output rate) ÷ (design capacity) x 100%
Answer: