ISQS 3344 Exam 2 Questions and Answers with Verified Solutions |
Latest 2026 Update
Q: Flexible Resources
Answer:
Flexible equipment, multi-functional workers (cross-training).
Q: Push system
Answer:
Produces finished goods inventory in advance of customer demand using a
forecast of sales.
Q: Pull system
Answer:
Employees at a given work station go to the source of the required parts and
withdraw the units as they need them.
Q: Kanban cards
Answer:
K=d(p+w)(1+alpha)/C
,ISQS 3344 Exam 2 Questions and Answers with Verified Solutions |
Latest 2026 Update
Q: Kanban system
Answer:
Number of Kanban cards is directly proportional to the amount of WIP
inventory. Managers strive to reduce the number of cards through reduced lead times,
lower
alpha (safety stock). Rounding down is preferred.
Q: 3. Improving Quality (reducing variability)
Answer:
Empowerment-quality at the source.
Provide immediate feedback, goal is zero defects.
Q: Variability
Answer:
Less variability results in less waste.
, ISQS 3344 Exam 2 Questions and Answers with Verified Solutions |
Latest 2026 Update
Q: 4. Reduce Cost
Answer:
Simplicity; Find a simpler way to do things right. Reduced WIP.
Q: Capacity
Answer:
Traditional approach (excess capacity designed into system just in case problem
arises).
JIT approach (minimizes waste of having extra capacity).
Q: Group Technology
Answer:
1. Improved design
2. Reduced raw material and purchases
3. Simplified production planning and control
4. Improved layout, routing, and machine loading
5. Reduced tooling setup time, work in process, and production time
Latest 2026 Update
Q: Flexible Resources
Answer:
Flexible equipment, multi-functional workers (cross-training).
Q: Push system
Answer:
Produces finished goods inventory in advance of customer demand using a
forecast of sales.
Q: Pull system
Answer:
Employees at a given work station go to the source of the required parts and
withdraw the units as they need them.
Q: Kanban cards
Answer:
K=d(p+w)(1+alpha)/C
,ISQS 3344 Exam 2 Questions and Answers with Verified Solutions |
Latest 2026 Update
Q: Kanban system
Answer:
Number of Kanban cards is directly proportional to the amount of WIP
inventory. Managers strive to reduce the number of cards through reduced lead times,
lower
alpha (safety stock). Rounding down is preferred.
Q: 3. Improving Quality (reducing variability)
Answer:
Empowerment-quality at the source.
Provide immediate feedback, goal is zero defects.
Q: Variability
Answer:
Less variability results in less waste.
, ISQS 3344 Exam 2 Questions and Answers with Verified Solutions |
Latest 2026 Update
Q: 4. Reduce Cost
Answer:
Simplicity; Find a simpler way to do things right. Reduced WIP.
Q: Capacity
Answer:
Traditional approach (excess capacity designed into system just in case problem
arises).
JIT approach (minimizes waste of having extra capacity).
Q: Group Technology
Answer:
1. Improved design
2. Reduced raw material and purchases
3. Simplified production planning and control
4. Improved layout, routing, and machine loading
5. Reduced tooling setup time, work in process, and production time