OSIC STUDY GUIDE 1 EXAM NEWEST 2025/2026 WITH COMPLETE QUESTIONS AND CORRECT
DETAILED ANSWER S |ALREADY GRADED A+||BRAND NEW VERSION!|
what document establishes AIT requirements and procedures for the
accomplishment of modernization - DETAILED ANSWER -TS9090-310
what is required for an AIT to be authorized to install Alts/SCs? - DETAILED
ANSWER -RMMCO check-in
-NSA check-in
-Must have accepted QMS
who is the single Naval Activity responsible for the integration, oversight,
and verification of all work accomplished by all activities? - DETAILED
ANSWER -NSA
which areas are to be monitored by the osic? - DETAILED ANSWER --
production schedule
-quality of work
-compliance with requirements
, T/F: AIT OSIC must be a government or military employee - DETAILED
ANSWER -True what QA documents are developed by the AIT for each alt
and are required to be on-site during install? - DETAILED ANSWER -QAWB
Scenario: a design flaw was ID'd after approval of SIDs which necessitates
a drawing change. what doc shall be submitted to obtain approval of this
SID change? - DETAILED ANSWER -Liaison Action Record
QAWB Section 1 - DETAILED ANSWER -Alteration/SC description
QAWB Section 2 - DETAILED ANSWER -Personnel Records
QAWB Section 3 - DETAILED ANSWER -OQE- SIs, processes, approval
letters, etc.
QAWB Section 4 - DETAILED ANSWER -Installation POA&M
QAWB Section 5 - DETAILED ANSWER -SC/ SIDs or Install Procedures
QAWB Section 6 - DETAILED ANSWER -Test and Inspection plan
QAWB Section 7 - DETAILED ANSWER -Test and inspection record
when should the OSIC meet with RMMCO - DETAILED ANSWER -Both
before and after install
DETAILED ANSWER S |ALREADY GRADED A+||BRAND NEW VERSION!|
what document establishes AIT requirements and procedures for the
accomplishment of modernization - DETAILED ANSWER -TS9090-310
what is required for an AIT to be authorized to install Alts/SCs? - DETAILED
ANSWER -RMMCO check-in
-NSA check-in
-Must have accepted QMS
who is the single Naval Activity responsible for the integration, oversight,
and verification of all work accomplished by all activities? - DETAILED
ANSWER -NSA
which areas are to be monitored by the osic? - DETAILED ANSWER --
production schedule
-quality of work
-compliance with requirements
, T/F: AIT OSIC must be a government or military employee - DETAILED
ANSWER -True what QA documents are developed by the AIT for each alt
and are required to be on-site during install? - DETAILED ANSWER -QAWB
Scenario: a design flaw was ID'd after approval of SIDs which necessitates
a drawing change. what doc shall be submitted to obtain approval of this
SID change? - DETAILED ANSWER -Liaison Action Record
QAWB Section 1 - DETAILED ANSWER -Alteration/SC description
QAWB Section 2 - DETAILED ANSWER -Personnel Records
QAWB Section 3 - DETAILED ANSWER -OQE- SIs, processes, approval
letters, etc.
QAWB Section 4 - DETAILED ANSWER -Installation POA&M
QAWB Section 5 - DETAILED ANSWER -SC/ SIDs or Install Procedures
QAWB Section 6 - DETAILED ANSWER -Test and Inspection plan
QAWB Section 7 - DETAILED ANSWER -Test and inspection record
when should the OSIC meet with RMMCO - DETAILED ANSWER -Both
before and after install