Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 10 pages
Exam (elaborations)

CEPSCI EXAM QUESTIONS WITH COMPLETE SOLUTIONS

Document preview thumbnail
Preview 2 out of 10 pages

CEPSCI EXAM QUESTIONS WITH COMPLETE SOLUTIONS

Content preview

CEPSCI EXAM QUESTIONS WITH COMPLETE
SOLUTIONS


Sedimentation - CORRECT ANSWER✔✔-the process by which eroded | | | | | | | |



material is transported and deposited | | | |




"CGP" stand for - CORRECT ANSWER✔✔-Construction General Permit;
| | | | | | | |



one of the NPDES permits administered by DHEC
| | | | | | |




When do you need a land disturbance permit - CORRECT ANSWER✔✔->
| | | | | | | | | |



or = 1 acre
| | | | |




or
> or = 0.5acres with in 0.5 miles of a water body in a coastal county
| | | | | | | | | | | | | | |




What is a SWPPP - CORRECT ANSWER✔✔-Storm Water Pollution
| | | | | | | | |



Prevention Plan | |




-Identifies potential sources of storm water pollution
| | | | | |




-describes storm water control measures | | | | |




-tells how CGP will be followed
| | | | |

, Whats in a SWPPP - CORRECT ANSWER✔✔--Copy of Permit
| | | | | | | | |




-Copy of "Notice of Intent" (NOI)
| | | | |




-Copy of approval letter from SCDHEC
| | | | | |




-Construction plans | |




-Inspection report | |




-Copy o 404 permit and 401 certificate when applicable
| | | | | | | |




In coastal zones the SWPPP must also include what 2 documents -
| | | | | | | | | | | |



CORRECT ANSWER✔✔--Coastal Zone Consistency Letter (CZC)
| | | | |




-Critical Area Permit (when applicable)
| | | |




Who are the three parties in a CGP - CORRECT ANSWER✔✔--Owner:
| | | | | | | | | | |



person or business who took out the CGP
| | | | | | | |




-Operator: individual who has day-to-day operational control
| | | | | | |




-Secondary Operator: Primary contractor | | |




How often are inspections done? - CORRECT ANSWER✔✔-Every 7 days
| | | | | | | | |




once a month for temporarily stabilized area
| | | | | |




Does a rain gauge need to be present of site? - CORRECT ANSWER✔✔-
| | | | | | | | | | | |



Yes

Document information

Uploaded on
July 24, 2026
Number of pages
10
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$14.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Lectphilip
4.0
(41)
Sold
278
Followers
6
Items
26130
Last sold
1 day ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions