Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 4 out of 47 pages
Exam (elaborations)

NM LP-5 INSTALLATION SERVICE AND REPAIR EXAM 2026 PRACTICE QUESTIONS AND ANSWERS + rationals pdf

Document preview thumbnail
Preview 4 out of 47 pages

NM LP-5 INSTALLATION SERVICE AND REPAIR EXAM 2026 PRACTICE QUESTIONS AND ANSWERS + rationals pdf

Content preview

NM LP-5 INSTALLATION SERVICE AND
REPAIR EXAM 2026 PRACTICE
QUESTIONS AND ANSWERS + rationals
pdf



EXAM OVERVIEW

The New Mexico LP-5 Installation, Service, and Repair Exam is a specialized
licensing test administered by PSI for propane professionals. It rigorously assesses
competency in the safe installation, maintenance, and repair of Liquefied
Petroleum Gas (LPG) systems.

Key Reference Codes:

• NFPA 54 – National Fuel Gas Code
• NFPA 58 – Liquefied Petroleum Gas Code

License Classification: LP-5 license authorizes installation, service, and repair of
LP gas systems, including liquid transfer facilities.

License Renewal: Every 3 years.

Exam Provider: PSI (Professional Services, Inc.)




SECTION 1: INSTALLATION PROCEDURES (Questions 1-20)

,1. Before beginning any installation of an NM LP-5 unit, the first step should be
to:

A) Connect power temporarily
B) Read the manufacturer's installation manual
C) Remove all panels for inspection
D) Apply lubricant to moving parts

Correct Answer: B

Rationale: Always consult the manufacturer's installation manual first to
understand specific requirements, torque values, clearance, and safety warnings.
Skipping this step can lead to improper installation, voided warranty, or hazardous
conditions.




2. When installing an NM LP-5 regulator, what is the minimum required
clearance from a building opening?

A) 1 foot
B) 3 feet
C) 5 feet
D) 10 feet

Correct Answer: B

Rationale: NFPA 58 and typical LP-gas codes require a minimum of 3
feet clearance from building openings (windows, doors, vents) to prevent gas
accumulation from entering the structure in case of a leak.

,3. What is the correct orientation for installing an NM LP-5 pressure relief
valve?

A) Upside down
B) Horizontal only
C) Vertical with spindle upright
D) Any orientation

Correct Answer: C

Rationale: Relief valves must be installed vertically with the spindle/stem
upright to ensure proper sealing and operation; otherwise, debris or gravity can
impede function.




4. The primary purpose of the sediment trap in an NM LP-5 installation is to:

A) Increase gas pressure
B) Catch debris and condensate
C) Reduce gas temperature
D) Act as a shut-off valve

Correct Answer: B

Rationale: Sediment traps (drip legs) collect dirt, pipe scale, and moisture before
they enter the regulator or appliance, protecting internal components.




5. What type of pipe joint compound is approved for NM LP-5 gas lines?

, A) White Teflon tape only
B) Any PTFE tape
C) Yellow PTFE tape or gas-rated pipe dope
D) Standard plumber's putty

Correct Answer: C

Rationale: Yellow PTFE tape is specifically rated for gas lines (thicker and more
resistant). White tape is for water applications. Plumber's putty degrades and is not
approved for gas lines.




6. The maximum allowable operating pressure for an NM LP-5 low-pressure
system is typically:

A) 0.5 psi
B) 5 psi
C) 2 psi
D) 10 psi

Correct Answer: A

Rationale: Low-pressure propane systems usually operate at 11 inches water
column (about 0.4 psi), so 0.5 psi is the common maximum allowable operating
pressure.




7. The NM LP-5's primary power supply should be:

Document information

Uploaded on
July 24, 2026
Number of pages
47
Written in
2025/2026
Type
Exam (elaborations)
Contains
Unknown
$25.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
BestwriterGuru
4.8
(721)
Sold
222
Followers
32
Items
5014
Last sold
1 day ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions