C) Exam Questions & Verified Answers 2026 | Complete
Study Guide & Latest Practice Test
The purpose of Construction Quality Management is to: - correct answers -Achieve the quality
established by properly developed requirements through the combined responsibility, but seperate
efforts of contractpr smd government personnel.
Construction Quality Management is the performance of tasks, which ensure that construction is
performed. - correct answers -According to plans and specifications, on time, within a defined budget
and a safe work environment.
Partnering relationships are based upon: - correct answers -Building trust and dedication to common
goals
It is the responsibility of Quality Assurance Personnel to: - correct answers -Periodically verify that the
contractors system of control is working effectively.
An effective contractor quality control program will: - correct answers -Be an incentive for work to be
done correctly the first time resulting in earlier completion, reduced field overhead costs, and greater
profits.
The success or failure of all contractors is based upon: - correct answers -The ability to control costs,
finance work, estimate jobs, schedule the work, and maintain effective quality control.
Quality Assurance Personnel have the responsibility to: - correct answers -Require contractors to
maintain the quality specified in the plans and specifications.
1
, Inspection is: - correct answers -The process by which ongoing and completed work is examined
During the punch-out inspection of a project: - correct answers -Quality Assurance Personnel must
assure that the contractor prepares a punch-list and makes corrections.
If there is a disagreement whether the contractors work complies with the contract: - correct answers -
The government makes the final determination
Characteristics that describe a definable feature of work include: - correct answers -Cross-referenced
listings to the contractors construction schedule that may have more than one definable feature under a
section of the specifications.
The _____________________ consists of daily checks of the work to assure continuing compliance with
contract requirements. - correct answers -Follow-up phase
The Quality Assurance Plan: - correct answers -Is a government management tool establishing staffing,
training, pre-award activities, and surveillance activities.
Testing is extremely important in construction quality management and is performed by: - correct
answers -Both the contractor and the government
If the contractor does not provide an adequate superintendent, the contract allows the contracting
officer to: - correct answers -Require the contractor to assume personal supervision of the work.
The Quality Control Plan: - correct answers -Is the foundation upon which quality work is based and
outlines planned quality control procedures.