Clean Water Act 1970s law that set into place the regulation of stormwater
NPDES Requirements for managing stormwater activity on a construction site are outlined
in the following regulation
Immediately after the project award and before the Onsite stormwater pollution prevention plan (SWPPP) binder should be put
general contractor begins any site work together by the general contractor
Flushing a spill down the storm drain Which of the following is not a beneficial use of water
Discharge from contaminated ground water Which of the following is never an allowable stormwater discharge from a
construction site.
All construction activity, inside and outside the building is The notice of termination (NOT) can be filed when
complete and permanent stabilization has been verified
is adequate to meet permit requirements