Question 1: What is the primary responsibility of a New York Site Safety Manager?
A) Prepare architectural drawings
B) Supervise payroll operations
C) Ensure compliance with safety regulations and protect workers and the public
D) Operate heavy equipment
Correct Answer: C
,Rationale: The Site Safety Manager is responsible for implementing safety programs,
ensuring regulatory compliance, and protecting workers, pedestrians, and property. This
is the core function of the SSM role as defined by NYC Building Code Chapter 33 and
DOB regulations .
Question 2: According to NYC Building Code Section 3310.1, a Site Safety Manager
is required for:
A) Any building over 5 stories
B) Major buildings – 15 stories or more, OR 200 feet or more in height
C) All residential construction projects
D) Buildings with more than 50 workers on site
Correct Answer: B
Rationale: BC §3310.1 explicitly requires a Site Safety Manager for major buildings
defined as 15+ stories or 200+ feet in height. A Site Safety Coordinator may be required
for smaller thresholds (10 stories/125 feet) .
Question 3: A building with a footprint of 100,000 square feet or more is classified
as:
A) A minor building requiring only a Site Safety Coordinator
B) A major building regardless of height requiring a Site Safety Manager
C) A standard building with no special safety requirements
D) A building requiring only FDNY oversight
Correct Answer: B
Rationale: Under NYC Code, a major building is also defined as a building with a
footprint of 100,000 square feet or more, regardless of height. This is an important
alternative threshold for SSM requirements .
,Question 4: What document must be maintained on-site and updated daily by the
Site Safety Manager?
A) The architectural blueprint set
B) The OSHA 300 injury log
C) The Site Safety Log
D) The project payroll records
Correct Answer: C
Rationale: The Site Safety Log is a mandatory regulatory document where the manager
records daily inspections, safety violations, and corrective actions taken. Failure to
maintain this log on site constitutes a violation of NYC Construction Code Section
3310.5 .
Question 5: According to 1 RCNY §3301-02, how long must the Site Safety Log be
retained after project completion?
A) 6 months
B) 1 year
C) 3 years
D) 5 years
Correct Answer: C
Rationale: The Site Safety Log must be kept for a minimum of 3 years after the final
permit is signed off or project completion. This retention period is standard for DOB
compliance records .
Question 6: If an alternate SSM relieves the primary SSM, this must be recorded in
the:
A) Daily work report submitted to the owner
B) Site Safety Log with names and times
C) Payroll records for billing purposes
D) Concrete pour log documentation
, Correct Answer: B
Rationale: The site safety log must document any change in designated safety
personnel, including when an alternate SSM relieves the primary SSM. Names and times
of transfer must be recorded to ensure accountability .
Question 7: Failure to maintain a Site Safety Log on the construction site can result
in:
A) A written warning only for first offense
B) A stop-work order and civil penalties
C) Permit fee reduction for compliance
D) No penalty if no accident occurred
Correct Answer: B
Rationale: DOB inspectors may issue a stop-work order and impose civil penalties for
failure to produce or maintain the required Site Safety Log. This is a serious regulatory
violation .
Question 8: Who is ultimately responsible for ensuring the Site Safety Plan is
followed on site?
A) The project architect
B) The Site Safety Manager (SSM)
C) The general contractor's foreman
D) The building owner
Correct Answer: B
Rationale: The SSM has overall responsibility for enforcing the Site Safety Plan and
ensuring all site activities comply with safety regulations. This is a core duty of the
position .
EXAM STUDY GUIDE 2026/2027
ACCURATE QUESTIONS WITH
CORRECT DETAILED SOLUTIONS ||
100% GUARANTEED PASS NEWEST
VERSION
SECTION 1: SSM ROLES, RESPONSIBILITIES, AND REGULATORY
FRAMEWORK
Question 1: What is the primary responsibility of a New York Site Safety Manager?
A) Prepare architectural drawings
B) Supervise payroll operations
C) Ensure compliance with safety regulations and protect workers and the public
D) Operate heavy equipment
Correct Answer: C
,Rationale: The Site Safety Manager is responsible for implementing safety programs,
ensuring regulatory compliance, and protecting workers, pedestrians, and property. This
is the core function of the SSM role as defined by NYC Building Code Chapter 33 and
DOB regulations .
Question 2: According to NYC Building Code Section 3310.1, a Site Safety Manager
is required for:
A) Any building over 5 stories
B) Major buildings – 15 stories or more, OR 200 feet or more in height
C) All residential construction projects
D) Buildings with more than 50 workers on site
Correct Answer: B
Rationale: BC §3310.1 explicitly requires a Site Safety Manager for major buildings
defined as 15+ stories or 200+ feet in height. A Site Safety Coordinator may be required
for smaller thresholds (10 stories/125 feet) .
Question 3: A building with a footprint of 100,000 square feet or more is classified
as:
A) A minor building requiring only a Site Safety Coordinator
B) A major building regardless of height requiring a Site Safety Manager
C) A standard building with no special safety requirements
D) A building requiring only FDNY oversight
Correct Answer: B
Rationale: Under NYC Code, a major building is also defined as a building with a
footprint of 100,000 square feet or more, regardless of height. This is an important
alternative threshold for SSM requirements .
,Question 4: What document must be maintained on-site and updated daily by the
Site Safety Manager?
A) The architectural blueprint set
B) The OSHA 300 injury log
C) The Site Safety Log
D) The project payroll records
Correct Answer: C
Rationale: The Site Safety Log is a mandatory regulatory document where the manager
records daily inspections, safety violations, and corrective actions taken. Failure to
maintain this log on site constitutes a violation of NYC Construction Code Section
3310.5 .
Question 5: According to 1 RCNY §3301-02, how long must the Site Safety Log be
retained after project completion?
A) 6 months
B) 1 year
C) 3 years
D) 5 years
Correct Answer: C
Rationale: The Site Safety Log must be kept for a minimum of 3 years after the final
permit is signed off or project completion. This retention period is standard for DOB
compliance records .
Question 6: If an alternate SSM relieves the primary SSM, this must be recorded in
the:
A) Daily work report submitted to the owner
B) Site Safety Log with names and times
C) Payroll records for billing purposes
D) Concrete pour log documentation
, Correct Answer: B
Rationale: The site safety log must document any change in designated safety
personnel, including when an alternate SSM relieves the primary SSM. Names and times
of transfer must be recorded to ensure accountability .
Question 7: Failure to maintain a Site Safety Log on the construction site can result
in:
A) A written warning only for first offense
B) A stop-work order and civil penalties
C) Permit fee reduction for compliance
D) No penalty if no accident occurred
Correct Answer: B
Rationale: DOB inspectors may issue a stop-work order and impose civil penalties for
failure to produce or maintain the required Site Safety Log. This is a serious regulatory
violation .
Question 8: Who is ultimately responsible for ensuring the Site Safety Plan is
followed on site?
A) The project architect
B) The Site Safety Manager (SSM)
C) The general contractor's foreman
D) The building owner
Correct Answer: B
Rationale: The SSM has overall responsibility for enforcing the Site Safety Plan and
ensuring all site activities comply with safety regulations. This is a core duty of the
position .