FDNY P-99 Certificate of Fitness EXAM
WITH ACCURATE QUESTIONS AND
ANSWERS (VERIFIED ANSWERS) |
LATEST (2026/2027) UPDATED
VERSION | 100% GUARANTEED PASS
{JUST RELEASED}
1. What is a general requirement of the location of the installation of a boiler? -
ANSWER ✓ Adequate clearance from combustile construction
2. What temperature must the materials remain under during combustion? -
ANSWER ✓ 170 degrees
3. What is a requirement for the access of the boiler? - ANSWER ✓ Access for
operation and maintenance must not be hazardous
4. What is required upon installation to operate a boiler? - ANSWER ✓
Inspection and test resulting in equipment use permit from commissioner
, 5. How often should a boiler be inspected? - ANSWER ✓ Once a year
6. What documentation is required from a certificate holder? - ANSWER ✓
Owners annual statement
7. What is required to hydrostatically test upon installation and who should
perform these tests? - ANSWER ✓ Liquid fuel piping and fuel oil storage tanks
by the installing contractor
8. At what pressure should piping be tested? - ANSWER ✓ 1/2 max working
pressure but less than pressure required for storage tank
9. At what pressure should oil storage tanks be tested? - ANSWER ✓ At 1 1/2x
max working pressure but never < 25 psi
10. How long should hydrostatic pressure be maintained? - ANSWER ✓ Until all
joints and connections are inspected for leaks and at 30 minutes have passed
11. Who is responsible for testing gas distribution piping? - ANSWER ✓ Installing
contractor before closing and operation
WITH ACCURATE QUESTIONS AND
ANSWERS (VERIFIED ANSWERS) |
LATEST (2026/2027) UPDATED
VERSION | 100% GUARANTEED PASS
{JUST RELEASED}
1. What is a general requirement of the location of the installation of a boiler? -
ANSWER ✓ Adequate clearance from combustile construction
2. What temperature must the materials remain under during combustion? -
ANSWER ✓ 170 degrees
3. What is a requirement for the access of the boiler? - ANSWER ✓ Access for
operation and maintenance must not be hazardous
4. What is required upon installation to operate a boiler? - ANSWER ✓
Inspection and test resulting in equipment use permit from commissioner
, 5. How often should a boiler be inspected? - ANSWER ✓ Once a year
6. What documentation is required from a certificate holder? - ANSWER ✓
Owners annual statement
7. What is required to hydrostatically test upon installation and who should
perform these tests? - ANSWER ✓ Liquid fuel piping and fuel oil storage tanks
by the installing contractor
8. At what pressure should piping be tested? - ANSWER ✓ 1/2 max working
pressure but less than pressure required for storage tank
9. At what pressure should oil storage tanks be tested? - ANSWER ✓ At 1 1/2x
max working pressure but never < 25 psi
10. How long should hydrostatic pressure be maintained? - ANSWER ✓ Until all
joints and connections are inspected for leaks and at 30 minutes have passed
11. Who is responsible for testing gas distribution piping? - ANSWER ✓ Installing
contractor before closing and operation