CAPSTONE PROJECT INSTRUCTIONS
The capstone project assesses the program outcomes through a conclusion information system
(IS) component that solves your client’s needs. Each phase of the project should include one
Microsoft Word document that follows APA guidelines and one zip file containing the
applicable programming code, development material, and/or system configuration.
Instructions for the capstone project are detailed below in three (3) phases.
Phase I Capstone Requirements
I. General Outline
a. APA formatted paper
b. Cover page
c. Table of Contents (TOC)
d. Introduction and conclusion sections
e. Each section must be well supported with the textbook, respected
industry whitepapers, and scholarly information systems journal articles
II. Project Solution
a. Zip file including all work completed for the customer associated with the
WBS that parallel the assigned modules/week. For example:
i. WBS indicates 10 project tasks will occur during the assigned weeks
leading up to the due date of this phase of the capstone, all code
necessary to complete these tasks is necessary to include for credit
b. All files/code/configurations must identify the author’s effort using
comment sections throughout. For example:
i. // Lines 0-50 written by Anna Anderson
ii. // Lines 50-100 written by Sam Smith
III. Biblical Worldview
a. Final project closeout will require Biblical worldview integration, begin
planning for this in the early stages of the project’s implementation
b. Identify several Biblical principles that apply to working in a coordinated
effort with others to achieve the solution
IV. Testing Evaluation Plan and Report
a. Create a plan for User Acceptance Testing (UAT)/evaluating the new IS.
b. Create a list of tasks that the user should be able to complete using the new IS.
The system should fulfil both the user requirements and support all business
and user scenarios.
V. User Acceptance Testing (UAT) Report
a. Observe the user utilizing the new IS system and the tasks that the user should
be able to complete using the new system. Take notes during testing.
b. Create an Excel spreadsheet to store the data collected during testing.
The capstone project assesses the program outcomes through a conclusion information system
(IS) component that solves your client’s needs. Each phase of the project should include one
Microsoft Word document that follows APA guidelines and one zip file containing the
applicable programming code, development material, and/or system configuration.
Instructions for the capstone project are detailed below in three (3) phases.
Phase I Capstone Requirements
I. General Outline
a. APA formatted paper
b. Cover page
c. Table of Contents (TOC)
d. Introduction and conclusion sections
e. Each section must be well supported with the textbook, respected
industry whitepapers, and scholarly information systems journal articles
II. Project Solution
a. Zip file including all work completed for the customer associated with the
WBS that parallel the assigned modules/week. For example:
i. WBS indicates 10 project tasks will occur during the assigned weeks
leading up to the due date of this phase of the capstone, all code
necessary to complete these tasks is necessary to include for credit
b. All files/code/configurations must identify the author’s effort using
comment sections throughout. For example:
i. // Lines 0-50 written by Anna Anderson
ii. // Lines 50-100 written by Sam Smith
III. Biblical Worldview
a. Final project closeout will require Biblical worldview integration, begin
planning for this in the early stages of the project’s implementation
b. Identify several Biblical principles that apply to working in a coordinated
effort with others to achieve the solution
IV. Testing Evaluation Plan and Report
a. Create a plan for User Acceptance Testing (UAT)/evaluating the new IS.
b. Create a list of tasks that the user should be able to complete using the new IS.
The system should fulfil both the user requirements and support all business
and user scenarios.
V. User Acceptance Testing (UAT) Report
a. Observe the user utilizing the new IS system and the tasks that the user should
be able to complete using the new system. Take notes during testing.
b. Create an Excel spreadsheet to store the data collected during testing.