Construction Quality Management for Contractors
Question and Answer [2026] | UPDATED ACTUAL
Exam | A+ Verified
• Design-Build contracts require -✓✓ The QC Manager to be in place and take an
active role in the review and coordination of the design.
• Which of the following is included in all three phases of the Three Phases of
Control? -✓✓ Safety
• The purpose of Construction Quality Management is to -✓✓ Achieve the quality
established by properly developed requirements through the combined
responsibility, but separate, efforts of contractors and government personnel
• Testing is extremely important in construction quality management and is
performed by -✓✓ Both the contractor and the government
• The primary purpose of the Three-Phase Control System is to -✓✓ Require the
contractor to plan, schedule, and perform quality management actions to assure
work meets all specified quality standards
• Quality Assurance Personnel have the responsibility to -✓✓ Require the
contractor to maintain the quality specified in the plans and specifications
• The _________________ is the appropriate time to assure that all materials
and/or equipment have been tested, submitted, and approved -✓✓ Preparatory
Phase
, • The Preconstruction Conference and Coordination and Mutual Understanding
Meeting Are -✓✓ Conducted prior to the commencement of any physical
construction work
• Contractor testing procedures: -✓✓ Are specified in the technical specs, outlined
in the QCP, and addressed at Coordination and Mutual Understanding Meeting
• The Quality Control Plan contains -✓✓ Identification of individual quality
quality control personnel, including name, qualifications, assigned duties,
responsibilities and authorities.
• Tests that are unannounced, randomly performed, and repeat quality control tests
are -✓✓ Quality assurance tests
• The contractor is required to conduct a Preparatory Phase Meeting before they
begin any definable feature of work except when -✓✓ There are no exceptions to
the rule
• During the punch-out inspection of a project: -✓✓ Quality Control personnel
prepare and punch-list and make corrections
• The Quality Control Report should include -✓✓ All of the above
• In a design build contract, if the contractor has a question about the design, what
is the process to get an answer? -✓✓ Contractor submits a design verification
request to the contractor's design team
Question and Answer [2026] | UPDATED ACTUAL
Exam | A+ Verified
• Design-Build contracts require -✓✓ The QC Manager to be in place and take an
active role in the review and coordination of the design.
• Which of the following is included in all three phases of the Three Phases of
Control? -✓✓ Safety
• The purpose of Construction Quality Management is to -✓✓ Achieve the quality
established by properly developed requirements through the combined
responsibility, but separate, efforts of contractors and government personnel
• Testing is extremely important in construction quality management and is
performed by -✓✓ Both the contractor and the government
• The primary purpose of the Three-Phase Control System is to -✓✓ Require the
contractor to plan, schedule, and perform quality management actions to assure
work meets all specified quality standards
• Quality Assurance Personnel have the responsibility to -✓✓ Require the
contractor to maintain the quality specified in the plans and specifications
• The _________________ is the appropriate time to assure that all materials
and/or equipment have been tested, submitted, and approved -✓✓ Preparatory
Phase
, • The Preconstruction Conference and Coordination and Mutual Understanding
Meeting Are -✓✓ Conducted prior to the commencement of any physical
construction work
• Contractor testing procedures: -✓✓ Are specified in the technical specs, outlined
in the QCP, and addressed at Coordination and Mutual Understanding Meeting
• The Quality Control Plan contains -✓✓ Identification of individual quality
quality control personnel, including name, qualifications, assigned duties,
responsibilities and authorities.
• Tests that are unannounced, randomly performed, and repeat quality control tests
are -✓✓ Quality assurance tests
• The contractor is required to conduct a Preparatory Phase Meeting before they
begin any definable feature of work except when -✓✓ There are no exceptions to
the rule
• During the punch-out inspection of a project: -✓✓ Quality Control personnel
prepare and punch-list and make corrections
• The Quality Control Report should include -✓✓ All of the above
• In a design build contract, if the contractor has a question about the design, what
is the process to get an answer? -✓✓ Contractor submits a design verification
request to the contractor's design team