Content preview

Construction Quality Management for Contractors
Question and Answer [2026] | UPDATED ACTUAL
Exam | Complete Exam Prep
• Design-Build contracts require -✓✓ The QC Manager to be in place and take an active
role in the review and coordination of the design.

• Which of the following is included in all three phases of the Three Phases of Control? -
✓✓ Safety

• The purpose of Construction Quality Management is to -✓✓ Achieve the quality
established by properly developed requirements through the combined responsibility,
but separate, efforts of contractors and government personnel

• Testing is extremely important in construction quality management and is performed
by -✓✓ Both the contractor and the government

• The primary purpose of the Three-Phase Control System is to -✓✓ Require the
contractor to plan, schedule, and perform quality management actions to assure work
meets all specified quality standards

• Quality Assurance Personnel have the responsibility to -✓✓ Require the contractor to
maintain the quality specified in the plans and specifications

• The _________________ is the appropriate time to assure that all materials and/or
equipment have been tested, submitted, and approved -✓✓ Preparatory Phase

• The Preconstruction Conference and Coordination and Mutual Understanding Meeting
Are -✓✓ Conducted prior to the commencement of any physical construction work

• Contractor testing procedures: -✓✓ Are specified in the technical specs, outlined in the
QCP, and addressed at Coordination and Mutual Understanding Meeting

• The Quality Control Plan contains -✓✓ Identification of individual quality quality control
personnel, including name, qualifications, assigned duties, responsibilities and
authorities.

• Tests that are unannounced, randomly performed, and repeat quality control tests are
-✓✓ Quality assurance tests

• The contractor is required to conduct a Preparatory Phase Meeting before they begin
any definable feature of work except when -✓✓ There are no exceptions to the rule

, • During the punch-out inspection of a project: -✓✓ Quality Control personnel prepare
and punch-list and make corrections

• The Quality Control Report should include -✓✓ All of the above

• In a design build contract, if the contractor has a question about the design, what is the
process to get an answer? -✓✓ Contractor submits a design verification request to the
contractor's design team

• Submittals are -✓✓ Necessary to demonstrate that the proposed materials, etc. are in
compliance with the contract.

• The success or failure of all contractors is based upon -✓✓ The ability to control costs,
finance work, estimate jobs, schedule the work and maintain effective quality control

• The contract requires the contractor to submit quality control reports -✓✓ Daily

• All submittals for government approval must be provided by the _________________
in time to allow for the review, approval, procurement, delivery, and performance of
preparatory phase for an item before it is needed for construction. -✓✓ Contractor to the
Government

• Partnering relationships are based upon -✓✓ Building trust and dedication to common
goals

• ENG Form 4288-R, the submittal register: -✓✓ Identifies those submittals identified in
the contract and the corresponding submittal action codes

• What is a purpose of the Coordination and Mutual Understanding Meeting? -✓✓ The
government and contractor meet to discuss implementation of the QC plan

• Characteristics that describe a definable feature of work include: -✓✓ Cross-
referenced listings to the contractor's construction schedule that may have more than
one definable feature under a section of the specifications

• Requests for Information are submitted to -✓✓ Ask for clarification of the contract

• The ___________ is workmanship oriented, and where workmanship standards are
established -✓✓ Initial Phase

• Grounds for withholding payment include the contractors failure to: -✓✓ Perform in
accordance with the terms of the contract, provide an acceptable QCP, and build to the
quality standards established by the contract.

Document information

Uploaded on
July 22, 2026
Number of pages
12
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$12.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
PACKPASS
3.7
(7)
Sold
56
Followers
3
Items
8213
Last sold
4 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions