Fire Lieutenant Exam
Study online at https://quizlet.com/_95rq3a
1. What are the ar- AL FF1 certified
rival - Interior 360 w/ TIC
Attack Considera- Secure gas/power/water board
tions? Identify structure details (basement, voids, use)
Identify scene details (power lines, terrain, access)
Accountability system
2. What are EN- COLT WAS WEALTH SPENDING MONSTER
ROUTE consider- - Construction
ations? - Occupancy
- Life hazards
- Terrain
- Water supply
- Appliances (FDC, sprinklers, standpipes)
- Street (access, width, grade)
- Apparatus (staffing: training/skill)
- Weather
- Exposures
- Area
- Location Fire
- Time of day (school in/out, holiday, sleeping)
- Height of structure
- Special considerations (power lines, fuel load, HZMT)
- Mutual aid
3. What INTERI- 2 firefighters (radio/lights/forced entry tools)
OR attack sup- Tac channel (1/2) prior to entry
plies, tactics not- 1 3/4 attack line (95gpm)
ed on scene be- PPV when possible
fore/during oper- NO entry if BACKDRAFT showing (vent, safe)
ations? NO MASTER STREEM + INTERIOR ATTACK
, Fire Lieutenant Exam
Study online at https://quizlet.com/_95rq3a
FAILED extinguishment <2min: adjust "DEFENSIVE"
2 (30min) bottles (no more until rehab: 20min/EMS)
4. Considerations Used BACKDRAFT / MAIN ATTIC fire
for VERTICAL Vent crew: 2 FF min
ventilation? 1 3/4 handline (95gpm)
Vent crews FIRE GROUND Freq
NFPA ladder WINDWARD of VENT OPENING
5. Considerations ANYTIME VERT NOT USED
for HORIZONTAL Open LEEWARD first ’WINDWARD
ventilation?
6. Considerations Used VERT or HORIZ
for PPV use? NOT INITIATED until EXHAUST crew in place + opening completed
OPENING 2 - 2.5 GREATER than intake opening (fan)
ATTACK crew READY for ENTRY (fire increase)
Start/Stop at proper times/monitored
Fan placed UNBURNED SIDE (push fire AWAY)
FF w/ PPV at ALL times (emergency)
7. What are the AR- - Reports "on" SCENE + LOCATION (confirm address)
RIVAL SCENE con- - Structure / Occupancy
siderations? - FIRE/ SMOKE conditions
- Assign TASKS (POWER board: elect, gas, water)
- HYDRANT location
- WATER supply
- DECLARE "working FIRE" - Offensive/Defensive (nothing showing, working fire,
fully involved)
- ESTABLISH command (location)
- 360 SIZE UP (TIC)
8.
Study online at https://quizlet.com/_95rq3a
1. What are the ar- AL FF1 certified
rival - Interior 360 w/ TIC
Attack Considera- Secure gas/power/water board
tions? Identify structure details (basement, voids, use)
Identify scene details (power lines, terrain, access)
Accountability system
2. What are EN- COLT WAS WEALTH SPENDING MONSTER
ROUTE consider- - Construction
ations? - Occupancy
- Life hazards
- Terrain
- Water supply
- Appliances (FDC, sprinklers, standpipes)
- Street (access, width, grade)
- Apparatus (staffing: training/skill)
- Weather
- Exposures
- Area
- Location Fire
- Time of day (school in/out, holiday, sleeping)
- Height of structure
- Special considerations (power lines, fuel load, HZMT)
- Mutual aid
3. What INTERI- 2 firefighters (radio/lights/forced entry tools)
OR attack sup- Tac channel (1/2) prior to entry
plies, tactics not- 1 3/4 attack line (95gpm)
ed on scene be- PPV when possible
fore/during oper- NO entry if BACKDRAFT showing (vent, safe)
ations? NO MASTER STREEM + INTERIOR ATTACK
, Fire Lieutenant Exam
Study online at https://quizlet.com/_95rq3a
FAILED extinguishment <2min: adjust "DEFENSIVE"
2 (30min) bottles (no more until rehab: 20min/EMS)
4. Considerations Used BACKDRAFT / MAIN ATTIC fire
for VERTICAL Vent crew: 2 FF min
ventilation? 1 3/4 handline (95gpm)
Vent crews FIRE GROUND Freq
NFPA ladder WINDWARD of VENT OPENING
5. Considerations ANYTIME VERT NOT USED
for HORIZONTAL Open LEEWARD first ’WINDWARD
ventilation?
6. Considerations Used VERT or HORIZ
for PPV use? NOT INITIATED until EXHAUST crew in place + opening completed
OPENING 2 - 2.5 GREATER than intake opening (fan)
ATTACK crew READY for ENTRY (fire increase)
Start/Stop at proper times/monitored
Fan placed UNBURNED SIDE (push fire AWAY)
FF w/ PPV at ALL times (emergency)
7. What are the AR- - Reports "on" SCENE + LOCATION (confirm address)
RIVAL SCENE con- - Structure / Occupancy
siderations? - FIRE/ SMOKE conditions
- Assign TASKS (POWER board: elect, gas, water)
- HYDRANT location
- WATER supply
- DECLARE "working FIRE" - Offensive/Defensive (nothing showing, working fire,
fully involved)
- ESTABLISH command (location)
- 360 SIZE UP (TIC)
8.