A cumulative list of job deficiencies/rework items can be found in: answer
>>>>Quality Control Report
Contractor benefits of CQM answer >>>>Increased profit and production, better
communications, planning, improved organizational skills, and outstanding
performance evaluations to obtain future contracts.
contractor quality control function answer >>>>To assure that the completed
project meets all quality requirements of the contract.
Purpose of CQM answer >>>>The government's efforts, separate from, but in
coordination and cooperation with the contractor, assure that the quality set by
the plans and specifications is achieved.
Two factors cause construction industry to become highly specialized answer
>>>>changing markets and increased tech and regulations
Factor that will influence both government and construction industry in the future
answer >>>>New government regulations, greater influence from consumer,
improvement in QC and QA requirements, construction-oriented management
info systems, formal partnering involving stakeholders, more reliance on design-
build, more considerate for live cycle requirements and increased based
incentives
, CQM
A definable feature of work: answer >>>>Can consist of a combination of
multiple specification sections depending upon the nature of the work
Actual construction on the jobsite begins: answer >>>>After an interim or final
QC is accepted
All submittals for government approval must be provided by the
_________________ in time to allow for the review, approval, procurement,
delivery, and performance of preparatory phase for an item before it is needed
for construction. answer >>>>Contractor to the Government
An effective contractor quality control program will answer >>>>Be an incentive
for work to be done correctly the first time resulting in earlier completion,
reduced field overhead costs, and greater profits
Characteristics that describe a definable feature of work include: answer
>>>>Cross-referenced listings to the contractor's construction schedule that may
have more than one definable feature under a section of the specifications
Construction Quality Management is the performance of tasks, which ensure that
construction is performed: answer >>>>According to plans and specifications, on
time, within a defined budget and a safe work environment
Contractor testing procedures: answer >>>>are outlined in the Quality Control
Plan as defined by section 0145N/01451A and addressed at the Coordination and
Metal Understanding Meeting (Navy).
Control is answer >>>>A continual system of planned future activities (its
preventative)