The contractor must thoroughly review all ___ prior to signing a contract - (answer)A & B
Contractual allocations of ___, which are assumed by the contractor and owner during
construction, are contained within the contract specifications. - (answer)RISK
Legal precedence establishes the ___ as the governing document when there is a discrepancy
between various parts of the contract documents. - (answer)AGREEMENT
The ___ section of the contract specifications include Bid bonds, Performance bonds and Labor
and Materials bonds. - (answer)CONTRACT FORMS
The ___ is included in the Technical Specifications section. - (answer)Actual Products, Divisions
of segments of work, Execution of individual trades.
During the bidding process period, changes to the contract documents are called ___. -
(answer)Addenda
, A ___ will determine how long the project will last and what the time-sensitive expenses will be.
- (answer)Project schedule
A ___ Chart is the simplest scheduling method that has been commonly used for years. -
(answer)Bar
___ CY quantity is used when drilling or blasting rock is taken off. - (answer)In-Ground
___ is used to measure concrete taken off. - (answer)cubit foot
The ___ and ___ should be examined and reviewed prior to placement operations. -
(answer)Form Joints, Class of concrete & slump, Batching plant & scheduled rounds
___ are factors affecting concrete work and concrete work estimations. - (answer)compressive
strength per square inch
additives, Air entertainment
When quick-curing concrete Type III - ___ is used. - (answer)High early
WITH 100% RATED EXPERT SOLUTIONS |2026 LATEST UPDATED
The contractor must thoroughly review all ___ prior to signing a contract - (answer)A & B
Contractual allocations of ___, which are assumed by the contractor and owner during
construction, are contained within the contract specifications. - (answer)RISK
Legal precedence establishes the ___ as the governing document when there is a discrepancy
between various parts of the contract documents. - (answer)AGREEMENT
The ___ section of the contract specifications include Bid bonds, Performance bonds and Labor
and Materials bonds. - (answer)CONTRACT FORMS
The ___ is included in the Technical Specifications section. - (answer)Actual Products, Divisions
of segments of work, Execution of individual trades.
During the bidding process period, changes to the contract documents are called ___. -
(answer)Addenda
, A ___ will determine how long the project will last and what the time-sensitive expenses will be.
- (answer)Project schedule
A ___ Chart is the simplest scheduling method that has been commonly used for years. -
(answer)Bar
___ CY quantity is used when drilling or blasting rock is taken off. - (answer)In-Ground
___ is used to measure concrete taken off. - (answer)cubit foot
The ___ and ___ should be examined and reviewed prior to placement operations. -
(answer)Form Joints, Class of concrete & slump, Batching plant & scheduled rounds
___ are factors affecting concrete work and concrete work estimations. - (answer)compressive
strength per square inch
additives, Air entertainment
When quick-curing concrete Type III - ___ is used. - (answer)High early