What services is the Architect responsible for regarding the negotiated proposals?


Give this one a try later!


1. Distribute proposal documents to prospective contractors.
2. Organize and participate in selection interviews with the prospective
contractors.
3. Participate in negotiations with prospective contractors.
4. Prepare a summary report of the negotiation results.




What are methods the Architect uses to conduct a Post Occupancy Evaluation?


Give this one a try later!

, A POE usually involved gathering feedback from the building occupants,
through surveys, questionnaires, interviews and workshops, but may also
involve more quantitative measures, such as cost analysis, usage statistics
and temperature, air quality or acoustical qualities.




What is represented to the Owner and Architect when the Contractor submits shop
drawings, product data and samples?


Give this one a try later!


The Contractor represents that he/she has:
1. Reviewed and approved the documents.
2. Determined and verified materials, field measurements and field
construction criteria, or will do so.
3. Checked and coordinated information with the Contract Documents.
[See AIA A201 3.12.6]




What does the Certificate of Substantial Completion establish?


Give this one a try later!


1. The date of Substantial Completion.
2. The responsibilities of the Owner and Contractor for security,
maintenance, heat, utilities, and damage to the work and insurance
(typically transferred to Owner).
3. Warranty period begins for work.
4. Release of Retainage to Contractor.
5. Statue of Limitations time clock begins.

,Detailed pricing based on the actual components being considered, including
windows, curtain walls, finishes and equipment.


Give this one a try later!


Cost estimating method used during the Design Development




What are the consequences of not sending a Preliminary 20 Day Notice to the
Owner?


Give this one a try later!


Failure to send the Preliminary 20 Day Notice can cause the
subcontractors, vendors, or material suppliers to lose some or all of their
lien rights.




Typical project schedule, itemized by phase


Give this one a try later!

, 1. Schematic Design: Time to complete affected by project size and
complexity; quality of Client's program info; decision making ability of
Client; design team. Usually 1-2 months.
2. Design Development: Time to complete affect by complexity of project.
Usually 2-6 months.
3. Construction Documents: Time to complete affect by complexity of
project. Usually 3-7 months.
4. Bidding & Negotiation: Usually 3-6 weeks.
5. Construction Administration: Varies depending on size/complexity of
project. May require years to complete.




Is AIA B201 a standalone document?


Give this one a try later!


No, it must be incorporated into an Owner-Architect Agreement, such as
AIA B102.




Drawings or additional instructions that modify the Contract Documents after they
have been issued to the bidder (but before received bids). Must be sent to all bidders.


Give this one a try later!


Addenda




Who established the requirements for the construction schedule?


Give this one a try later!

Document information

Uploaded on
July 17, 2026
Number of pages
64
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$10.50

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
CLASSROOMTEST
3.4
(10)
Sold
47
Followers
2
Items
7464
Last sold
1 month ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions