Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 12 pages
Exam (elaborations)

ACI CONCRETE FIELD TESTING TECHNICIAN- GRADE I QUESTIONS AND CORRECT VERIFIED ANSWERS

Document preview thumbnail
Preview 2 out of 12 pages

ACI CONCRETE FIELD TESTING TECHNICIAN- GRADE I QUESTIONS AND CORRECT VERIFIED ANSWERS

Content preview

ACI CONCRETE FIELD TESTING
TECHNICIAN- GRADE I QUESTIONS AND
CORRECT VERIFIED ANSWERS
TheA2sensorA2ofA2theA2temperatureA2measuringA2deviceA2shallA2beA2submergedA2aA2mini
mumA2ofA2_____A2in.A2[_____mm]A2intoA2theA2freshlyA2mixedA2concrete.A2-A2Ans--
3A2in.A2[75A2mm]

TheA2temperatureA2measuringA2deviceA2shallA2haveA2aA2capacityA2ofA2measuringA2temper
atureA2ofA2freshlyA2mixedA2concreteA2toA2+-A2_____A2degreesA2FA2[+-
A2_____A2C]A2throughoutA2aA2rangeA2ofA2_____.A2-A2Ans--
1A2degreeA2FA2[0.5A2C],A230A2degreesA2FA2toA2120A2FA2[0A2CA2toA250A2C]

TheA2temperatureA2measuringA2deviceA2shallA2beA2calibratedA2_____,A2orA2wheneverA2the
reA2isA2aA2questionA2ofA2_____.A2-A2Ans--Annually,A2accuracy

TheA2temperatureA2ofA2concreteA2mayA2beA2measuredA2inA2aA2wheelbarrow.A2TrueA2orA2F
alse?A2-A2Ans--True

TheA2temperatureA2ofA2concreteA2mayA2beA2measuredA2inA2aA2wallA2form.A2TrueA2ofA2Fals
eA2-A2Ans--True

AA2compositeA2sampleA2ofA2concreteA2isA2requiredA2evenA2ifA2theA2onlyA2purposeA2forA2obt
ainingA2theA2sampleA2isA2toA2determineA2temperature.A2TrueA2ofA2False?A2-A2Ans--False

WhatA2mustA2beA2doneA2toA2theA2sampleA2containerA2priorA2toA2samplingA2theA2concrete?
A2-A2Ans--DampenA2(withA2water)


WhatA2mustA2beA2doneA2toA2theA2concreteA2surroundingA2theA2temperatureA2measuringA2
deviceA2afterA2theA2deviceA2isA2submergedA2inA2theA2freshA2concrete.A2-A2Ans--
GentlyA2pressA2theA2concreteA2aroundA2theA2temperatureA2measuringA2deviceA2atA2theA2s
urfaceA2ofA2theA2concrete

HowA2longA2mustA2theA2temperatureA2measuringA2deviceA2remainA2inA2theA2freshlyA2mixe
dA2concrete?A2-A2Ans--AtA2leastA22A2minutesA2butA2notA2moreA2thanA25A2minutes

AfterA2theA2temperatureA2ofA2theA2concreteA2isA2read,A2whatA2isA2required?A2-A2Ans--
ReportingA2ofA2temperature

TheA2temperatureA2ofA2concreteA2isA2reportedA2toA2theA2nearestA2_____A2degreesA2FA2[__
___A2C]A2-A2Ans--1A2degreeA2FA2[0.5A2C]

, AccordingA2toA2ASTMA2C1064,A2whatA2isA2oneA2reasonA2toA2takeA2theA2temperatureA2ofA2c
oncrete?A2-A2Ans--
VerifyA2conformanceA2toA2aA2specifiedA2requirementA2forA2temperatureA2ofA2concrete

AA2maximumA2temperatureA2ofA2freshlyA2mixedA2concreteA2isA2specifiedA2inA2ASTMA2C10
64.A2TrueA2ofA2False?A2-A2Ans--False

TheA2sampleA2ofA2concreteA2usedA2forA2temperatureA2determinationA2mustA2beA2roddedA2
25A2times.A2TrueA2orA2False?A2-A2Ans--False

SamplingA2byA2thisA2methodA2isA2requiredA2whenA2testsA2areA2toA2beA2madeA2toA2determin
eA2_____A2withA2specificationA2requirements.A2-A2Ans--Compliance

ThisA2methodA2coversA2samplingA2fromA2fourA2typesA2ofA2mixturesA2whichA2areA2_____,A2
_____,A2_____,A2andA2_____.A2-A2Ans--
StationaryA2mixers,A2pavingA2mixers,A2revolvingA2drumA2mixers,A2andA2openA2topA2mixers

TheA2maximumA2allowableA2timeA2betweenA2obtainingA2theA2firstA2andA2finalA2portionsA2of
A2aA2compositeA2sampleA2isA2_____A2minutes.A2-A2Ans--15


PortionsA2ofA2aA2compositeA2sampleA2shallA2beA2thoroughlyA2remixedA2bforeA2beginningA2t
estsA2onA2theA2sample.A2TrueA2ofA2False?A2-A2Ans--True

TheA2maximumA2elapsedA2timeA2allowedA2betweenA2obtainingA2theA2finalA2portionA2ofA2th
eA2compositeA2sampleA2andA2beginningA2theA2testsA2forA2slump,A2temperature,A2andA2airA2
contentA2isA2_____A2minutes.A2-A2Ans--5

TheA2moldingA2ofA2strengthA2testA2specimensA2shallA2beginA2withinA2_____A2minutesA2afte
rA2fabricatingA2theA2compositeA2sample.A2-A2Ans--15

TheA2concreteA2sampleA2mustA2beA2protectedA2fromA2contaminationA2andA2_____.A2-
A2Ans--RapidA2evaporation


TheA2minimumA2sizeA2sampleA2forA2makingA2strengthA2testA2specimensA2isA2_____.A2-
A2Ans--28A2LA2(1ft^3)


WhenA2samplingA2fromA2aA2stationaryA2mixer,A2theA2batchA2mustA2beA2sampledA2atA2____
_A2orA2moreA2regularlyA2spacedA2intervalsA2duringA2dischargeA2ofA2theA2middleA2portionA2o
fA2theA2batchA2-A2Ans--2

TheA2compositeA2sampleA2forA2aA2pavingA2mixerA2mustA2representA2aA2minimumA2ofA2___
__A2differentA2portionsA2ofA2theA2batchA2ofA2concreteA2takenA2fromA2theA2pileA2afterA2disch
arge.A2-A2Ans--5

Document information

Uploaded on
July 16, 2026
Number of pages
12
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$14.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
LECTUREKIM
1.0
(2)
Sold
12
Followers
0
Items
3990
Last sold
2 weeks ago




Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions