U3 ICC TANK TIGHTNESS TESTING
COMPREHENSIVE EXAMINATION TEST
SOLVED QUESTIONS AND ANSWERS
GRADED A+
⩥ An automatic shut-off device must stop the flow into the tank
when the:
a. Tank is 90% full.
b. Delivery truck is 95% empty.
c. Tank is filled to no more than 95% of capacity.
d. Fuel level is 48 inches from the bottom of the tank..
Answer: c. Tank is filled to no more than 95% of capacity
CCR; 2635 (b)(2)(C)
⩥ When an ATG system is used to monitor a tank, a 0.2
gallon/hour leak test must be performed:
a. At least once daily.
,b. At least once monthly.
c. At least once yearly.
d. As specified by the equipment manufacturer..
Answer: b. At least once monthly.
CCR; 2643 (b)
⩥ A Monitoring System Certification includes all of the
following, EXCEPT:
a. Submittal of a completed "Monitoring System Certification"
form.
b. Pre-notification to the local agency of scheduled Monitoring
System Certification date.
c. Affixing a tag/sticker to each monitoring equipment
component that is certified, repaired, or replaced.
d. Posting the "Monitoring System Certification" form in a
visible location at the UST facility..
Answer: d. Posting the "Monitoring System Certification" form
in a visible location at the UST facility.
CCR; 2638 (b)
,⩥ According to CCR Title 23, UST Regulations, a person who
performs a monitoring System Certification must possess all of
the following, EXCEPT:
a. A tank tester or contractor license.
b. A 40 Hour OSHA Hazwoper certificate.
c. An equipment manufacturer certification.
d. An ICC certification as Californian UST Service Technician..
Answer: b. A 40 Hour OSHA Hazwoper certificate
CCR; 2638 (b), 2715 (i)
⩥ Any person who intentionally disables or tampers with a leak
detection system in a manner to prevent the system from
detecting a leak is subject to a minimum fine
a. $ 500
b. $ 1,000
c. $ 5,000
d. $10,000.
, Answer: c. $ 5,000
H≻ 26299 (f)(2)
⩥ All of the following are true regarding diesel emergency
generator tank (EGT) systems, EXCEPT?
a. An EGT system in a vault is exempt from secondary
containment testing if visual inspections of the tank and piping
are conducted each time the tank system is operated, but no less
than monthly.
b. Unburied fuel piping connected to an EGT system is excluded
from the definition of the UST if visual inspections are
conducted each time the system is operated, but no less than
monthly.
c. Secondary containment components that are part of an EGT
system may be tested using ELD if the test is performed at the
frequency specified by the board pursuant to 23 CCR §2644.1.
d. Secondary containment components that are part of an EGT
system must be tested by January 1, 2005..
Answer: d. Secondary containment components that are part of
an EGT system must be tested by January 1, 2005.
COMPREHENSIVE EXAMINATION TEST
SOLVED QUESTIONS AND ANSWERS
GRADED A+
⩥ An automatic shut-off device must stop the flow into the tank
when the:
a. Tank is 90% full.
b. Delivery truck is 95% empty.
c. Tank is filled to no more than 95% of capacity.
d. Fuel level is 48 inches from the bottom of the tank..
Answer: c. Tank is filled to no more than 95% of capacity
CCR; 2635 (b)(2)(C)
⩥ When an ATG system is used to monitor a tank, a 0.2
gallon/hour leak test must be performed:
a. At least once daily.
,b. At least once monthly.
c. At least once yearly.
d. As specified by the equipment manufacturer..
Answer: b. At least once monthly.
CCR; 2643 (b)
⩥ A Monitoring System Certification includes all of the
following, EXCEPT:
a. Submittal of a completed "Monitoring System Certification"
form.
b. Pre-notification to the local agency of scheduled Monitoring
System Certification date.
c. Affixing a tag/sticker to each monitoring equipment
component that is certified, repaired, or replaced.
d. Posting the "Monitoring System Certification" form in a
visible location at the UST facility..
Answer: d. Posting the "Monitoring System Certification" form
in a visible location at the UST facility.
CCR; 2638 (b)
,⩥ According to CCR Title 23, UST Regulations, a person who
performs a monitoring System Certification must possess all of
the following, EXCEPT:
a. A tank tester or contractor license.
b. A 40 Hour OSHA Hazwoper certificate.
c. An equipment manufacturer certification.
d. An ICC certification as Californian UST Service Technician..
Answer: b. A 40 Hour OSHA Hazwoper certificate
CCR; 2638 (b), 2715 (i)
⩥ Any person who intentionally disables or tampers with a leak
detection system in a manner to prevent the system from
detecting a leak is subject to a minimum fine
a. $ 500
b. $ 1,000
c. $ 5,000
d. $10,000.
, Answer: c. $ 5,000
H≻ 26299 (f)(2)
⩥ All of the following are true regarding diesel emergency
generator tank (EGT) systems, EXCEPT?
a. An EGT system in a vault is exempt from secondary
containment testing if visual inspections of the tank and piping
are conducted each time the tank system is operated, but no less
than monthly.
b. Unburied fuel piping connected to an EGT system is excluded
from the definition of the UST if visual inspections are
conducted each time the system is operated, but no less than
monthly.
c. Secondary containment components that are part of an EGT
system may be tested using ELD if the test is performed at the
frequency specified by the board pursuant to 23 CCR §2644.1.
d. Secondary containment components that are part of an EGT
system must be tested by January 1, 2005..
Answer: d. Secondary containment components that are part of
an EGT system must be tested by January 1, 2005.