Medical gas Exam | Verified Exam Questions and Answers | Latest
Updated Study Material 2026
Question:
Look at picture #1
Answer:
Look at picture #1
Question:
A. 6010
Answer:
Installers of a category 1 medical gas piped distribution
system must be qualified in accordance with ASSE 6010. What is the certification requirement
for installers of a category 3 medical gas piped distribution system?
Question:
A. 6010
B. 6020
C. 6030
D. Category 3 does NOT require certification
A. after blow down of the distribution piping
Answer:
When is the initial
pressure test conducted by installer?
Question:
A. after blow down of the distribution piping
B. after installation of alarm sensors
C. before blow down of the distribution piping
D. before installation of station rough-in assemblies
C. polymeric
Answer:
In those portions of systems intended to handle
,oxygen at pressures greater than 350 psi, the interconnecting hose shall NOT contain
materials.
Question:
A. brass
B. copper
C. polymeric
D. stainless steel
A. color coding
Answer:
Which of these is an NFPA 99 requirement for
the labeling of pipes in a medical gas system?
Question:
A. color coding
B. fixed label width
C. label shall wrap completely around the pipe
D. reflective label
D. The device will be supervised such that failure of communication shall initiate an alarm
Answer:
A wireless communication device is employed in a medical gas or
vacuum warning system. Which type of supervision is required for this device?
Question:
A. A visual indicator shall be located in the maintenance office or the engineering department.
B. The device shall be installed at the medical gas or vacuum source.
C. The device shall be located at a nurse's station
D. The device will be supervised such that failure of communication shall initiate an alarm.
D. zone valve box
Answer:
Refer to DIAGRAM 1. Identify #7
,Question:
A. in-line valve
B. main control valve
C. service valve
D. zone valve box
B. future
Answer:
Refer to DIAGRAM I. Identify #8
Question:
A. dead end
B. future valve
C. history valve
D. in-line valve
B. cut ends may be rolled smooth or deburred
Answer:
What sort of
treatment shall be permitted before brazing the cut ends of a tube to be installed in medical gas
piping systems?
Question:
A. An argon gas purge must be done.
B. Cut ends may be rolled smooth or deburred
C. Extensions need to be added for brazing
D. treatment is NOT required; they may be brazed "as is"
B. local;master
Answer:
Manifolds for gas cylinders shall actuate a(an)
signal and shall activate an indicator at all alarm panels to indicate when or
just before changeover from one header to the other.
, Question:
A. area; master
B. local; master
C. master; area
D. master; local
B. local
Answer:
Where liquid ring compressors are used, air receivers
shall be equipped with a high water level sensor that activates a(n) alarm indicator.
Question:
A. area
B. local
C. master
D. pressure
B. -22 degrees F
Answer:
Instrument air systems shall activate the alarm
systems when the dew point at system pressure exceeds how many degrees Fahrenheit?
Question:
A. -20 degrees F
B. -22 degrees F
C. -24 degrees F
D. -26 degrees F
A. station outlet / inlet
Answer:
In a non-anesthetizing area, on which
side of a zone valve shall the pressure/ vacuum sensor be located?
Question:
A. station outlet/ inlet
B. source side
Updated Study Material 2026
Question:
Look at picture #1
Answer:
Look at picture #1
Question:
A. 6010
Answer:
Installers of a category 1 medical gas piped distribution
system must be qualified in accordance with ASSE 6010. What is the certification requirement
for installers of a category 3 medical gas piped distribution system?
Question:
A. 6010
B. 6020
C. 6030
D. Category 3 does NOT require certification
A. after blow down of the distribution piping
Answer:
When is the initial
pressure test conducted by installer?
Question:
A. after blow down of the distribution piping
B. after installation of alarm sensors
C. before blow down of the distribution piping
D. before installation of station rough-in assemblies
C. polymeric
Answer:
In those portions of systems intended to handle
,oxygen at pressures greater than 350 psi, the interconnecting hose shall NOT contain
materials.
Question:
A. brass
B. copper
C. polymeric
D. stainless steel
A. color coding
Answer:
Which of these is an NFPA 99 requirement for
the labeling of pipes in a medical gas system?
Question:
A. color coding
B. fixed label width
C. label shall wrap completely around the pipe
D. reflective label
D. The device will be supervised such that failure of communication shall initiate an alarm
Answer:
A wireless communication device is employed in a medical gas or
vacuum warning system. Which type of supervision is required for this device?
Question:
A. A visual indicator shall be located in the maintenance office or the engineering department.
B. The device shall be installed at the medical gas or vacuum source.
C. The device shall be located at a nurse's station
D. The device will be supervised such that failure of communication shall initiate an alarm.
D. zone valve box
Answer:
Refer to DIAGRAM 1. Identify #7
,Question:
A. in-line valve
B. main control valve
C. service valve
D. zone valve box
B. future
Answer:
Refer to DIAGRAM I. Identify #8
Question:
A. dead end
B. future valve
C. history valve
D. in-line valve
B. cut ends may be rolled smooth or deburred
Answer:
What sort of
treatment shall be permitted before brazing the cut ends of a tube to be installed in medical gas
piping systems?
Question:
A. An argon gas purge must be done.
B. Cut ends may be rolled smooth or deburred
C. Extensions need to be added for brazing
D. treatment is NOT required; they may be brazed "as is"
B. local;master
Answer:
Manifolds for gas cylinders shall actuate a(an)
signal and shall activate an indicator at all alarm panels to indicate when or
just before changeover from one header to the other.
, Question:
A. area; master
B. local; master
C. master; area
D. master; local
B. local
Answer:
Where liquid ring compressors are used, air receivers
shall be equipped with a high water level sensor that activates a(n) alarm indicator.
Question:
A. area
B. local
C. master
D. pressure
B. -22 degrees F
Answer:
Instrument air systems shall activate the alarm
systems when the dew point at system pressure exceeds how many degrees Fahrenheit?
Question:
A. -20 degrees F
B. -22 degrees F
C. -24 degrees F
D. -26 degrees F
A. station outlet / inlet
Answer:
In a non-anesthetizing area, on which
side of a zone valve shall the pressure/ vacuum sensor be located?
Question:
A. station outlet/ inlet
B. source side