FLORIDA TERMITE CORRECT FINAL EXAMS
QUESTIONS AND ANSWERS SURE A+
✔✔who is responsible for covering new construction soil treatment area with visquine
within 24 hours of treatment? - ✔✔contractor
✔✔which of the following insurances is required for performing wdo inspections? -
✔✔errors and omissions
✔✔where are termiticides mixed? - ✔✔on the job site
✔✔which statute covers stored pesticides at facility? - ✔✔252
✔✔in post-construction treatment, you can treat the soil on the exterior perimeter with
injectors only if you don't feel like digging a trench around the home? - ✔✔false
✔✔which Florida statute covers burning pesticide containers? - ✔✔403
✔✔which type of pump for delivering liquid termiticides is most durable? - ✔✔piston
✔✔where would you further explain visible evidence or damage on the wdo report? -
✔✔in comments area
, ✔✔which would not be a reportable visible evidence of previous treatment? -
✔✔swarmer wings
✔✔attic openings for inspection should be a minimum size of? - ✔✔20 in by 20 in
✔✔where do bark beetles form their galleries? - ✔✔cambium layer
✔✔how would you calibrate your application equipment? - ✔✔measure how much you
collect in 1 minute in a graduated container
✔✔how do you treat bark Beetle infested wood? - ✔✔burn it
✔✔which is the minimum entrance size of opening to crawl space necessary for
inspections? - ✔✔16 in by 24 in
✔✔these wdo inspection tools are recommended except? - ✔✔moisture meters
✔✔which agency established regulations for Pest and rodent control - ✔✔fifra
✔✔who is responsible for providing tools, equipment, and training? - ✔✔certified
operator, licensee
✔✔for treatment of crawl space areas, plenums should be turned off before any
termiticides are applied - ✔✔true
✔✔when arriving at a job for a pretreat, who is responsible for notifying the foreman that
treatment is going to begin? - ✔✔applicator
✔✔who installs the plastic vapor barriers for a pretreat? - ✔✔contractor
✔✔when treating for subterranean termites at a property with an accessible crawl
space, where should treatment be directed - ✔✔peers, floor beams, interior stem wall,
exterior stem wall
✔✔which Pest Control categories are required to perform a wdo inspection and Report?
- ✔✔termite
✔✔which is the primary route of entry for borate termiticides - ✔✔oral
✔✔which insecticides do not Target the insects nervous system? - ✔✔borates
✔✔which are neonicotinoid pesticides? - ✔✔Imidacloprid, thiamethoxam
QUESTIONS AND ANSWERS SURE A+
✔✔who is responsible for covering new construction soil treatment area with visquine
within 24 hours of treatment? - ✔✔contractor
✔✔which of the following insurances is required for performing wdo inspections? -
✔✔errors and omissions
✔✔where are termiticides mixed? - ✔✔on the job site
✔✔which statute covers stored pesticides at facility? - ✔✔252
✔✔in post-construction treatment, you can treat the soil on the exterior perimeter with
injectors only if you don't feel like digging a trench around the home? - ✔✔false
✔✔which Florida statute covers burning pesticide containers? - ✔✔403
✔✔which type of pump for delivering liquid termiticides is most durable? - ✔✔piston
✔✔where would you further explain visible evidence or damage on the wdo report? -
✔✔in comments area
, ✔✔which would not be a reportable visible evidence of previous treatment? -
✔✔swarmer wings
✔✔attic openings for inspection should be a minimum size of? - ✔✔20 in by 20 in
✔✔where do bark beetles form their galleries? - ✔✔cambium layer
✔✔how would you calibrate your application equipment? - ✔✔measure how much you
collect in 1 minute in a graduated container
✔✔how do you treat bark Beetle infested wood? - ✔✔burn it
✔✔which is the minimum entrance size of opening to crawl space necessary for
inspections? - ✔✔16 in by 24 in
✔✔these wdo inspection tools are recommended except? - ✔✔moisture meters
✔✔which agency established regulations for Pest and rodent control - ✔✔fifra
✔✔who is responsible for providing tools, equipment, and training? - ✔✔certified
operator, licensee
✔✔for treatment of crawl space areas, plenums should be turned off before any
termiticides are applied - ✔✔true
✔✔when arriving at a job for a pretreat, who is responsible for notifying the foreman that
treatment is going to begin? - ✔✔applicator
✔✔who installs the plastic vapor barriers for a pretreat? - ✔✔contractor
✔✔when treating for subterranean termites at a property with an accessible crawl
space, where should treatment be directed - ✔✔peers, floor beams, interior stem wall,
exterior stem wall
✔✔which Pest Control categories are required to perform a wdo inspection and Report?
- ✔✔termite
✔✔which is the primary route of entry for borate termiticides - ✔✔oral
✔✔which insecticides do not Target the insects nervous system? - ✔✔borates
✔✔which are neonicotinoid pesticides? - ✔✔Imidacloprid, thiamethoxam