parking spots that are closest to the main entrance of the project (exclusive of spaces
designated for handicapped persons) or parking passes provided at a discounted
price.
Give this one a try later!
preferred parking
A site not previously developed or graded that could support open space, habitat, or
agriculture.
Give this one a try later!
GREENFIELD site
,the most effective way to optimize energy efficiency, by collaboration among all team
members, beginning at the start of a project , this method is necessary in designing
building systems.
Give this one a try later!
integrative, whole building approach
Who fills out the LEED Scorecard?
Give this one a try later!
The project team does during the LEED charrette.
What are the benefits of reducing heat islands?
Give this one a try later!
Reducing heat islands reduces air temperatures which would reduce the
need to cool that air in buildings. Thus energy consumption is lowered.
What do CFCs do to the environment?
Give this one a try later!
, destroy the ozone layer.
A measure of the total building floor area or dwelling units on a parcel of land relative
to the buildable land of that parcel. Units for measuring this may differ according to
credit requirements. Does not include structured parking.
Give this one a try later!
Density
What is Ozone Depletion Potential as it relates to refrigerants?
Give this one a try later!
The potential for a single molecule of the refrigerant to destroy the Ozone
Layer. The less the value of the ODP the better the refrigerant is for the
ozone layer and therefore the environment.
An internationally recognized green building certification system, providing third-
party verification that a building or community was designed and built using strategies
aimed at improving performance across all the metrics that matter most: energy
savings, water efficiency, CO2 emissions reduction, improved indoor environmental
quality, and stewardship of resources and sensitivity to their impacts. (USGBC)
Give this one a try later!
, LEED
The estimated occupant usage of a project's fixtures and fittings using the flush and
flow rates from the EPAct 1992 standard
Give this one a try later!
baseline water demand of a building
A commissioning process that can be performed on existing buildings to identify and
recognize system improvements that make the building more suitable for current use.
Give this one a try later!
Retro-Commissioning
'For existing buildings, we found median commissioning costs of $______ ft2, whole-
building energy savings of 15%, and payback times of ____ years.
Give this one a try later!
$0.27 and 0.7 years
What is the maximum number of points a project can earn under the Regional Credit
category?
designated for handicapped persons) or parking passes provided at a discounted
price.
Give this one a try later!
preferred parking
A site not previously developed or graded that could support open space, habitat, or
agriculture.
Give this one a try later!
GREENFIELD site
,the most effective way to optimize energy efficiency, by collaboration among all team
members, beginning at the start of a project , this method is necessary in designing
building systems.
Give this one a try later!
integrative, whole building approach
Who fills out the LEED Scorecard?
Give this one a try later!
The project team does during the LEED charrette.
What are the benefits of reducing heat islands?
Give this one a try later!
Reducing heat islands reduces air temperatures which would reduce the
need to cool that air in buildings. Thus energy consumption is lowered.
What do CFCs do to the environment?
Give this one a try later!
, destroy the ozone layer.
A measure of the total building floor area or dwelling units on a parcel of land relative
to the buildable land of that parcel. Units for measuring this may differ according to
credit requirements. Does not include structured parking.
Give this one a try later!
Density
What is Ozone Depletion Potential as it relates to refrigerants?
Give this one a try later!
The potential for a single molecule of the refrigerant to destroy the Ozone
Layer. The less the value of the ODP the better the refrigerant is for the
ozone layer and therefore the environment.
An internationally recognized green building certification system, providing third-
party verification that a building or community was designed and built using strategies
aimed at improving performance across all the metrics that matter most: energy
savings, water efficiency, CO2 emissions reduction, improved indoor environmental
quality, and stewardship of resources and sensitivity to their impacts. (USGBC)
Give this one a try later!
, LEED
The estimated occupant usage of a project's fixtures and fittings using the flush and
flow rates from the EPAct 1992 standard
Give this one a try later!
baseline water demand of a building
A commissioning process that can be performed on existing buildings to identify and
recognize system improvements that make the building more suitable for current use.
Give this one a try later!
Retro-Commissioning
'For existing buildings, we found median commissioning costs of $______ ft2, whole-
building energy savings of 15%, and payback times of ____ years.
Give this one a try later!
$0.27 and 0.7 years
What is the maximum number of points a project can earn under the Regional Credit
category?