• According to AHERA, to complete a response action of a non-NESHAP size
project, how many samples must be taken with results of what? -✓✓ 5 samples
taken inside with results of each <0.0 f/cc
• What are the notification requirements in Virginia? -✓✓ 20 calendar days for
any project greater than 10 sq feet or linear feet
• In what jurisdiction do individuals need an asbestos supervisor or working
linsense -✓✓ Need a license everywhere
• Type of bond that would ensure that the general contractor will compensate
subcontractors for labor and materials -✓✓ Performance Bond
• Minimum respiratory protection on a class 1 asbestos project with no NEA -✓✓
Full face air purifying respirator
• What is the maximum content permitted in the work area where an air purifying
respirator is being worn? -✓✓ 23.5%
• Chest XRays must be evaluated by what class reader? -✓✓ Class B
• What is the APF for a full face air purifying respirator -✓✓ 50
, • Friable ACM is any material that can be: -✓✓ Crushed, pulverized, reduced to
powder by hand pressure when dry
• The OSHA permissible exposure limit is -✓✓ 0.1 f/cc over 8 hours TWA
• According to ASHERA, how many air samples must be taken for final clearance
for NESHAP size project? -✓✓ 13 samples (5 inside, 5 outside, 2 fields blanks , one
sealed blank)TEM
• Laboratories that perform PLM and TEM must be accredited by -✓✓ National
Voluntary Laboratory Accreditation Program
• AHERA is for -✓✓ Public schools K-12
• What is the notification requirement for asbestos projects in DC -✓✓ 10
working days prior to start NESHAP size projects and any project over 18 square
feet of flooring. Building owner to notify tenants no less than 30 days prior to
start of the project in writing
• What is a NESHAP sized project -✓✓ 160 square feet, 260 linear feet, or 35 cubic
feet
• The competent person must inspect the work suits of the crew at least: -✓✓
Once a shift
Questions and Answers | Most Recent 2026
Update
• According to AHERA, to complete a response action of a non-NESHAP size
project, how many samples must be taken with results of what? -✓✓ 5 samples
taken inside with results of each <0.0 f/cc
• What are the notification requirements in Virginia? -✓✓ 20 calendar days for
any project greater than 10 sq feet or linear feet
• In what jurisdiction do individuals need an asbestos supervisor or working
linsense -✓✓ Need a license everywhere
• Type of bond that would ensure that the general contractor will compensate
subcontractors for labor and materials -✓✓ Performance Bond
• Minimum respiratory protection on a class 1 asbestos project with no NEA -✓✓
Full face air purifying respirator
• What is the maximum content permitted in the work area where an air purifying
respirator is being worn? -✓✓ 23.5%
• Chest XRays must be evaluated by what class reader? -✓✓ Class B
• What is the APF for a full face air purifying respirator -✓✓ 50
, • Friable ACM is any material that can be: -✓✓ Crushed, pulverized, reduced to
powder by hand pressure when dry
• The OSHA permissible exposure limit is -✓✓ 0.1 f/cc over 8 hours TWA
• According to ASHERA, how many air samples must be taken for final clearance
for NESHAP size project? -✓✓ 13 samples (5 inside, 5 outside, 2 fields blanks , one
sealed blank)TEM
• Laboratories that perform PLM and TEM must be accredited by -✓✓ National
Voluntary Laboratory Accreditation Program
• AHERA is for -✓✓ Public schools K-12
• What is the notification requirement for asbestos projects in DC -✓✓ 10
working days prior to start NESHAP size projects and any project over 18 square
feet of flooring. Building owner to notify tenants no less than 30 days prior to
start of the project in writing
• What is a NESHAP sized project -✓✓ 160 square feet, 260 linear feet, or 35 cubic
feet
• The competent person must inspect the work suits of the crew at least: -✓✓
Once a shift