Questions And Correct Answers
The lean ratio of an extension ladder
4:1
According to AHERA, to complete a response action of a non-NESHAP size
project, how many samples must be taken with results of what?
5 samples taken inside with results of each <0.0 f/cc
What are the notification requirements in Virginia?
20 calendar days for any project greater than 10 sq feet or linear feet
In what jurisdiction do individuals need an asbestos supervisor or working
linsense
Need a license everywhere
Type of bond that would ensure that the general contractor will compensate
subcontractors for labor and materials
, Performance Bond
Minimum respiratory protection on a class 1 asbestos project with no NEA
Full face air purifying respirator
What is the maximum content permitted in the work area where an air
purifying respirator is being worn?
23.5%
Chest XRays must be evaluated by what class reader?
Class B
What is the APF for a full face air purifying respirator
50
Friable ACM is any material that can be:
Crushed, pulverized, reduced to powder by hand pressure when dry