Written by students who passed Immediately available after payment Read online or as PDF Wrong document? Swap it for free 4.6 TrustPilot
logo-home
Document preview thumbnail
Preview 2 out of 5 pages
Exam (elaborations)

STORM WATER COMPLIANCE CONSTRUCTION TEST PAPER COMPLETE QUESTIONS AND ACCURATE ANSWERS PREMIUM REVIEW SHEET

Document preview thumbnail
Preview 2 out of 5 pages

STORM WATER COMPLIANCE CONSTRUCTION TEST PAPER COMPLETE QUESTIONS AND ACCURATE ANSWERS PREMIUM REVIEW SHEET

Content preview

STORM WATER COMPLIANCE
CONSTRUCTION TEST PAPER COMPLETE
QUESTIONS AND ACCURATE ANSWERS
PREMIUM REVIEW SHEET

●● NPDES
Answer: Requirements for managing storm water activity on a
construction site are outlined in the following regulation


●● Discharge From Contaminated Ground Water
Answer: Never an allowable discharge from a construction site


●● A notice of termination can be filed when?
Answer: All construction activity, inside and outside of the building is
complete. Permanent stabilization has been verified.


●● The storm water notice of intent must be submitted?
Answer: After the SWPPP is prepared and before starting construction.


●● Potential pollutant sources stored on a construction site may include?
Answer: Petroleum storage tanks, fertilizer, lime, and masonry materials.

, ●● The SWPPP implementation sequence may be modified?
Answer: After consulting with the project SWPPP designer (CEC) and if
required, the project owner and receiving written approval.


●● A SWPPP site map will show all of the following?
Answer: Location of BMP's, Phasing & Sequence, Limits of
Disturbance


●● Which of the following information is to be posted at the entrance to
the site?
Answer: Construction site notice, permit authorization, location of
SWPPP


●● Which of the following is not a beneficial use water?
Answer: Flushing water down a storm drain


●● When installing and maintaining a check dam make sure...?
Answer: The low point (overflow) of the check dam is in the middle of
the channel


●● To reduce the possibility of undercutting in channels, you should?
Answer: Install filter fabric under rock & similar materials placed within
the storm water conveyance.

Document information

Uploaded on
July 12, 2026
Number of pages
5
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$13.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Favorgrades
3.8
(194)
Sold
832
Followers
377
Items
54278
Last sold
4 days ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions