IEC YEAR 2, QUARTER 2 FINAL EXAM | COMPLETE QUESTIONS WITH 100% RATED
EXPERT SOLUTIONS |2026 LATEST UPDATED
1. Steel web bar joists are sized based on ___ anticipated loads: live and dead
2. What does OSB stand for?: Oriented Strand Board
3. What is the NEC table for burying electrical cables and raceways beneath concrete?: 300.5
4. ___ anchors are useful because they can eliminate the need for drilling after concrete is poured: Cast-in
5. After being poured, concrete reaches its full strength after how many days?-
: 28
6. Exposure to ___ is a health concern when drilling in concrete: silica
7. What is R value?: measure of thermal resistance
8. FRP stands for ___.: Fiber Reinforced Plastic
9. What does T&M stand for?: Time and Material
10. Generally, ___ engineers are responsible for developing plans and specs for dirt work and storm drainage on a
project.: civil
11. Equipment and mechanical drawings are typically drawn by the___.: architect
12. You can deviate from the specs if___>: the architect provides written approval
13. In MasterFormat 2014, certain divisions (such as 15 to 20) are not assigned because:: It allows for future
expansion without reorganizing the entire format
14. Per the Wendy's specifications, when are "AS-BUILT" drawings required to be provided to the A/E?: At the
conclusion of the project
1/4
EXPERT SOLUTIONS |2026 LATEST UPDATED
1. Steel web bar joists are sized based on ___ anticipated loads: live and dead
2. What does OSB stand for?: Oriented Strand Board
3. What is the NEC table for burying electrical cables and raceways beneath concrete?: 300.5
4. ___ anchors are useful because they can eliminate the need for drilling after concrete is poured: Cast-in
5. After being poured, concrete reaches its full strength after how many days?-
: 28
6. Exposure to ___ is a health concern when drilling in concrete: silica
7. What is R value?: measure of thermal resistance
8. FRP stands for ___.: Fiber Reinforced Plastic
9. What does T&M stand for?: Time and Material
10. Generally, ___ engineers are responsible for developing plans and specs for dirt work and storm drainage on a
project.: civil
11. Equipment and mechanical drawings are typically drawn by the___.: architect
12. You can deviate from the specs if___>: the architect provides written approval
13. In MasterFormat 2014, certain divisions (such as 15 to 20) are not assigned because:: It allows for future
expansion without reorganizing the entire format
14. Per the Wendy's specifications, when are "AS-BUILT" drawings required to be provided to the A/E?: At the
conclusion of the project
1/4