MTS Exam Questions and Answers with
Verified Solutions | Latest Updated 2026
what is the third step in ORM make risk decisions
the ____ is the most essential link instructor
in
the training chain
this instructional method is useful directed discussion
in
teaching skills such as problem
solving. it aides in channeling
students thinking and response
along predetermined lines.
navedtra ______ is the navy 135
school
management manual?
who is responsible for ensuring course supervisor
accuracy of data within cetars?
for "A" and "c" schools, an ARB student course average falls below
can minimum
be convened if? passing grade. unable to achieve
objectives.
performance is below expected academic
progress.
, the _____ is the 1st message HPRR announcement message
drafted
and released in the preparation for
HPRR
____ reviews and approves OPNAV
OCCSTDS
A ____ JDTA (job duty task targeted
analysis)
can be performed to address new
work requirements
when is FEA ( front end analysis) after JDTA
performed?
TRUE/FALSE true
A TPP (training project plan) is
required to cancel a course
which navedtra deal with 130, 131, 136
curriculum
development?
which navedtra is used for PPP 131
based curriculum development?
the ____ is a composite listing of RRL resource requirement list
all
the materials need to conduct
training
Verified Solutions | Latest Updated 2026
what is the third step in ORM make risk decisions
the ____ is the most essential link instructor
in
the training chain
this instructional method is useful directed discussion
in
teaching skills such as problem
solving. it aides in channeling
students thinking and response
along predetermined lines.
navedtra ______ is the navy 135
school
management manual?
who is responsible for ensuring course supervisor
accuracy of data within cetars?
for "A" and "c" schools, an ARB student course average falls below
can minimum
be convened if? passing grade. unable to achieve
objectives.
performance is below expected academic
progress.
, the _____ is the 1st message HPRR announcement message
drafted
and released in the preparation for
HPRR
____ reviews and approves OPNAV
OCCSTDS
A ____ JDTA (job duty task targeted
analysis)
can be performed to address new
work requirements
when is FEA ( front end analysis) after JDTA
performed?
TRUE/FALSE true
A TPP (training project plan) is
required to cancel a course
which navedtra deal with 130, 131, 136
curriculum
development?
which navedtra is used for PPP 131
based curriculum development?
the ____ is a composite listing of RRL resource requirement list
all
the materials need to conduct
training