✔✔__________ should be disposed of in an OSHA-approved fireproof container.
- Oily rags
- Paper
- Wood
- Metal scraps - ✔✔Oily rags
✔✔What is established when operating equipment is in good condition?
- The best operator for the job
- Normal running levels for physical characteristics
- Optimal order schedules for part inventory
- The storage of maintenance logs - ✔✔Normal running levels for physical
characteristics
✔✔What is everyone responsible for?
- Scheduling maintenance after equipment breakdown
- Completing work orders on time
- Keeping the work area clean of dirt, dust, and debris
- Filling out corrective action reports - ✔✔Keeping the work area clean of dirt, dust, and
debris
✔✔Results of tests, inspections, and a schedule for future maintenance can be found
where?
- User Manual
- Statement of work (SOW)
- Preventive maintenance log
- The employee break area - ✔✔Preventive maintenance log
✔✔The employee verifies that preventive maintenance is complete when __________.
- Closing out a PM work order
, - Beginning a PM work order
- Making random equipment inspections
- Completing a corrective action report - ✔✔Closing out a PM work order
✔✔A maintenance log records work performed on a piece of equipment. A maintenance
log should be kept for __________.
- Machines without safety guards
- Two weeks following a machine failure
- Machines that show signs of wear
- Every machine - ✔✔Every machine
✔✔Brooms and mops should be stored __________.
- Next to the machine
- In pairs
- In chemical cabinets
- In a designated area or cleaning closet - ✔✔In a designated area or cleaning closet
✔✔If a machine is obviously leaking, __________.
- The employee should notify a supervisor
- The employee should attempt to fix the machine
- The employee should shut down the machine immediately and evacuate
- The employee should throw some rags on the floor to soak up the leak - ✔✔The
employee should notify a supervisor
✔✔Product buildup is the most common vibration problem on __________.
- Cylinder pistons
- Hydraulic pump vanes
- Air fans
- Pneumatic valves - ✔✔Air fans
✔✔A __________ is important for a timely closure of PM work orders.
- Completion date
- Computerized system
- Incentive award
- Well-maintained machine - ✔✔Completion date
✔✔To reduce the time needed to clean inaccessible areas, what should operators do?
- Make areas more accessible.
- Prevent contamination from occurring.
- Skip routine cleanings as needed.
- Only A and B - ✔✔Only A and B
✔✔__________ normally include verification that the floor is clean.
- Routine housekeeping inspections
QUESTIONS AND ANSWERS SURE A+
✔✔__________ should be disposed of in an OSHA-approved fireproof container.
- Oily rags
- Paper
- Wood
- Metal scraps - ✔✔Oily rags
✔✔What is established when operating equipment is in good condition?
- The best operator for the job
- Normal running levels for physical characteristics
- Optimal order schedules for part inventory
- The storage of maintenance logs - ✔✔Normal running levels for physical
characteristics
✔✔What is everyone responsible for?
- Scheduling maintenance after equipment breakdown
- Completing work orders on time
- Keeping the work area clean of dirt, dust, and debris
- Filling out corrective action reports - ✔✔Keeping the work area clean of dirt, dust, and
debris
✔✔Results of tests, inspections, and a schedule for future maintenance can be found
where?
- User Manual
- Statement of work (SOW)
- Preventive maintenance log
- The employee break area - ✔✔Preventive maintenance log
✔✔The employee verifies that preventive maintenance is complete when __________.
- Closing out a PM work order
, - Beginning a PM work order
- Making random equipment inspections
- Completing a corrective action report - ✔✔Closing out a PM work order
✔✔A maintenance log records work performed on a piece of equipment. A maintenance
log should be kept for __________.
- Machines without safety guards
- Two weeks following a machine failure
- Machines that show signs of wear
- Every machine - ✔✔Every machine
✔✔Brooms and mops should be stored __________.
- Next to the machine
- In pairs
- In chemical cabinets
- In a designated area or cleaning closet - ✔✔In a designated area or cleaning closet
✔✔If a machine is obviously leaking, __________.
- The employee should notify a supervisor
- The employee should attempt to fix the machine
- The employee should shut down the machine immediately and evacuate
- The employee should throw some rags on the floor to soak up the leak - ✔✔The
employee should notify a supervisor
✔✔Product buildup is the most common vibration problem on __________.
- Cylinder pistons
- Hydraulic pump vanes
- Air fans
- Pneumatic valves - ✔✔Air fans
✔✔A __________ is important for a timely closure of PM work orders.
- Completion date
- Computerized system
- Incentive award
- Well-maintained machine - ✔✔Completion date
✔✔To reduce the time needed to clean inaccessible areas, what should operators do?
- Make areas more accessible.
- Prevent contamination from occurring.
- Skip routine cleanings as needed.
- Only A and B - ✔✔Only A and B
✔✔__________ normally include verification that the floor is clean.
- Routine housekeeping inspections