• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 2 out of 7 pages
Exam (elaborations)

Swppp Correct Test Paper Questions And Answers Set A.pdf

Document preview thumbnail
Preview 2 out of 7 pages

SWPPP CORRECT TEST PAPER QUESTIONS AND ANSWERS SET A.pdf

Content preview

SWPPP CORRECT TEST PAPER QUESTIONS AND
ANSWERS SET A+
✔✔Who is required to get NPDES Permit Coverage? - ✔✔- Construction site operators

Operators may include:
- GCs, independent subs, government officials, companies, or corporations
- Any party that has control over the construciton plans ans specs and/or
- Has day-to-day operational control of the site

✔✔Erosion control vs. Sediment Control - ✔✔- Erosion control measures (mulch,
blankets, mats, vegetative cover) protect the soil surface and prevent soil particles from
being dislodged and carried away by wind or water.

- Sediment control measures remove soil particles after they have been dislodged
(typically thought settling or filtration).

It is usually easier and less expensive to prevent erosion than it is to control
sedimentation.

✔✔Common SWPPP Objectives: - ✔✔- Stabilize the site as soon as possible
- Protect slopes and channels
- Reduce impervious surfaces and promote infiltration
- Control the perimeter of your site
- Protect receiving waters adjacent to your site
- Follow pollution prevention measures
- Minimizes the area and duration of exposed soils

✔✔The first step in developing an SWPPP: - ✔✔Evaluate your proposed construction
site. It should describe the undeveloped site and identify features of the land that can be
incorporated into the final plan and natural resources that should be protected.

, ✔✔Assess existing construction site conditions: - ✔✔- Assess how stormwater currently
drains from the site, identify location of discharge points or areas
- Identify slopes and slope lengths
- Identify soil types and any highly erodible soils and the soil's infiltration capacity
- Identify past soil contaminants
- Identify natural features

✔✔Fingerprinting - ✔✔Identifies natural features that you can protect from clearing and
heavy equipment by signage or physical barriers.

✔✔If your site's stormwater flows into a municipal storm drain system, you should: -
✔✔Determine the ultimate destination of that system's discharge.

✔✔If your site's stormwater could potentially reach two or more waterbodies, - ✔✔not
that in your SWPPP

✔✔The principal pollutant of concern is: - ✔✔sediment

✔✔Allowable non-stormwater discharges: - ✔✔- Discharges from fire-fighting activities
- Fire hydrant flushings
- Waters used to wash vehicles
- Buildings and pavements where detergents are not used
- Water used to control dust
- Potable water (including uncontaminated water line flushings)
- Uncontaminated air conditioning condensate
- Uncontaminated ground water or spring water

✔✔Permanent stormwater controls should be designed with 2 important goals in mind: -
✔✔1. Reduction of the volume and velocity of runoff
2. Reduction of the pollutants in the stormwater that does leave your site.

✔✔Total Maximum Daily Load (TMDL) - ✔✔A plan for correcting a situation, developed
from the state or EPA, for when a water is determined to be impaired.

✔✔Site maps should legibly identify the following features: - ✔✔- Stormwater flow and
discharges
- Areas and features to be protected
- Disturbed areas
- BMPs
- Areas of stabilization
- Other areas and roads (waste/storage)

✔✔The heart of any effective SWPPP: - ✔✔Erosion control, primary means of
preventing stormwater pollution

Document information

Uploaded on
July 8, 2026
Number of pages
7
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$17.49

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
EXAMCAFE
3.5
(43)
Sold
293
Followers
12
Items
36199
Last sold
7 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions