SWPPP ACTUAL COMPREHENSIVE QUESTIONS
AND ANSWERS SET A+
✔✔It is required by law, it documents storm water management activity on your site,
and it demonstrates your intent to manage storm water on your site - ✔✔You should
have a SWPPP for your construction site because?
✔✔Site specific - ✔✔A well constructed SWPPP for your site should be?
✔✔Prior to commencing construction - ✔✔The NOI must be submitted when?
✔✔Schedule of activities - ✔✔One necessary component of a good SWPPP is?
✔✔Weather and Climate - ✔✔Factors that may impact SWPPP scheduling activities
include
✔✔masonry materials, petroleum storage tanks, soil amendments fertilizer, lime etc -
✔✔Pollutant sources on a construction may include
✔✔Seek written approval of the project SWPPP designer or project owner - ✔✔If you
believe BMP modification are necessary to the site you must?
✔✔Endangered species and historical preservation - ✔✔The following consideration
may be incorporated into the SWPPP?
✔✔Site maps, erosion sediment control, BMPs, site specific sequences of construction
activities - ✔✔The SWPPP will contain the following?
✔✔Identify deficient and failed BMPs and make repairs immediately - ✔✔Once the site
has experienced rain event of measurable quantity you must?
, ✔✔Subcontractors web site - ✔✔The subcontractor certification includes all of the
following but the following?
✔✔Storm Water BMPs and their locations - ✔✔SWPPP site map includes the following
✔✔Present and current - ✔✔With the state general permit your primary responsibility is
to make sure the permit is?
✔✔Permit authorization letter - ✔✔Document that contains your permit number is?
✔✔The table of content - ✔✔Portion of the SWPPP that specifies the content of the
SWPPP is?
✔✔SWPPP certification letter - ✔✔Document in the SWPPP that certifies the GC
commitment to compliance or to SWPPP is?
✔✔Sub contractor's certification form. - ✔✔The certification document that identifies the
name and contact information of subcontractors on the site is the?
✔✔The site map - ✔✔Document that reveals the total area of disturbance is the?
✔✔The inspection report form - ✔✔The document that is completed by the SWPPP
inspector recording site condition during the inspection is?
✔✔Spill report form - ✔✔The document that must be completed when a hazardous spill
is on the site is the - ?
✔✔Weekly meeting form - ✔✔The document that verifies that the weekly meetings have
been conducted is the?
✔✔The delegation letter - ✔✔The document delegating inspection to another is the?
✔✔NOT (notice of termination) - ✔✔The document that must be completed when final
stabilization is completed is the?
✔✔Are considered and actual BMP category by the USEPA - ✔✔Scheduling and
Sequencing
✔✔Project bidding - ✔✔Which of these activities are not necessary parts of the
construction phase?
✔✔1.) carefully assess the situation 2.) request assistance and approval by the projects
SWPPP designer 3.) Receive written approval from the project SWPPP designer 4.)
Make necessary changes in the field and update site maps - ✔✔If a contractor
AND ANSWERS SET A+
✔✔It is required by law, it documents storm water management activity on your site,
and it demonstrates your intent to manage storm water on your site - ✔✔You should
have a SWPPP for your construction site because?
✔✔Site specific - ✔✔A well constructed SWPPP for your site should be?
✔✔Prior to commencing construction - ✔✔The NOI must be submitted when?
✔✔Schedule of activities - ✔✔One necessary component of a good SWPPP is?
✔✔Weather and Climate - ✔✔Factors that may impact SWPPP scheduling activities
include
✔✔masonry materials, petroleum storage tanks, soil amendments fertilizer, lime etc -
✔✔Pollutant sources on a construction may include
✔✔Seek written approval of the project SWPPP designer or project owner - ✔✔If you
believe BMP modification are necessary to the site you must?
✔✔Endangered species and historical preservation - ✔✔The following consideration
may be incorporated into the SWPPP?
✔✔Site maps, erosion sediment control, BMPs, site specific sequences of construction
activities - ✔✔The SWPPP will contain the following?
✔✔Identify deficient and failed BMPs and make repairs immediately - ✔✔Once the site
has experienced rain event of measurable quantity you must?
, ✔✔Subcontractors web site - ✔✔The subcontractor certification includes all of the
following but the following?
✔✔Storm Water BMPs and their locations - ✔✔SWPPP site map includes the following
✔✔Present and current - ✔✔With the state general permit your primary responsibility is
to make sure the permit is?
✔✔Permit authorization letter - ✔✔Document that contains your permit number is?
✔✔The table of content - ✔✔Portion of the SWPPP that specifies the content of the
SWPPP is?
✔✔SWPPP certification letter - ✔✔Document in the SWPPP that certifies the GC
commitment to compliance or to SWPPP is?
✔✔Sub contractor's certification form. - ✔✔The certification document that identifies the
name and contact information of subcontractors on the site is the?
✔✔The site map - ✔✔Document that reveals the total area of disturbance is the?
✔✔The inspection report form - ✔✔The document that is completed by the SWPPP
inspector recording site condition during the inspection is?
✔✔Spill report form - ✔✔The document that must be completed when a hazardous spill
is on the site is the - ?
✔✔Weekly meeting form - ✔✔The document that verifies that the weekly meetings have
been conducted is the?
✔✔The delegation letter - ✔✔The document delegating inspection to another is the?
✔✔NOT (notice of termination) - ✔✔The document that must be completed when final
stabilization is completed is the?
✔✔Are considered and actual BMP category by the USEPA - ✔✔Scheduling and
Sequencing
✔✔Project bidding - ✔✔Which of these activities are not necessary parts of the
construction phase?
✔✔1.) carefully assess the situation 2.) request assistance and approval by the projects
SWPPP designer 3.) Receive written approval from the project SWPPP designer 4.)
Make necessary changes in the field and update site maps - ✔✔If a contractor