What is the time requirements for a PJM member to submit a planned transmission
outage greater than 30 days in duration and be considered "On Time"?
3 days prior to outage
1 week prior to outage
6 months prior to outage
12 months prior to the outage
Give this one a try later!
6 months prior to outage
PJM issues a Cold Weather Alert when the forecasted temperature across the RTO or
a Control Zone is expected to be less than or equal to:
0 degrees Fahrenheit
5 degrees Fahrenheit
,10 degrees Fahrenheit
32 degrees Fahrenheit
Give this one a try later!
10 degrees Fahrenheit
During severe geomagnetic activity, if PJM observes GIC flow that exceeds a GIC
operating limit at two or more transformers, PJM will declare which of the following?
Geomagnetic Disturbance Action
Geomagnetic Disturbance Warning
NOAA Alert
GIC Alert
Give this one a try later!
Geomagnetic Disturbance Action
Your outage scheduling group has scheduled a planned outage to start today at
0800. Unfortunately due to weather, the outage will not start until tomorrow at 0700.
In this instance, how will the outage status be treated?
As a forced outage
As an unplanned outage
As "On Time"
As "Late"
Give this one a try later!
, As "On Time"
As a Transmission Owner Operator, if you are monitoring your system and security
analysis indicates constraints or violations on the system, what should you do?
Notify the PJM Master Coordinator
Notify the PJM Transmission Operator
Implement actions to mitigate the problem
Issue a local load dump
Give this one a try later!
Notify the PJM Transmission Operator
If your system configuration was such that you had three parallel line of the same
construction, length, and impedance with a normal rating of 155 MVA and an
emergency rating of 170 MVA. Each of the lines currently has a loading of 130 MVA on
each line. If one of the three lines were to trip out of service, what limits, if any, would
be exceeded?
Normal & Emergency
Normal only
Neither due to the surge impedance loading of the line
Emergency only
Give this one a try later!
Normal & Emergency
, What is the temperature threshold used for issuing a Hot Weather Alert for the
Dominion and EKPC Control Zones?
88 Degrees Fahrenheit
90 Degrees Fahrenheit
93 Degrees Fahrenheit
95 Degrees Fahrenheit
Give this one a try later!
93 Degrees Fahrenheit
If your system was experiencing high voltages, which of the following actions would
you implement to correct the problem?
Disconnect a reactor from the system
Connect a capacitor to the system
Reduce interchange flowing across your system
Disconnect a capacitor from the system
Give this one a try later!
Disconnect a capacitor from the system
The drawing represents what type of relay scheme?
Permissive Under-Reaching Transfer Trip Scheme
Direct Under-reaching Transfer Trip Scheme
Permissive Over-Reaching Transfer Trip Scheme
Phase Comparison Blocking Scheme
outage greater than 30 days in duration and be considered "On Time"?
3 days prior to outage
1 week prior to outage
6 months prior to outage
12 months prior to the outage
Give this one a try later!
6 months prior to outage
PJM issues a Cold Weather Alert when the forecasted temperature across the RTO or
a Control Zone is expected to be less than or equal to:
0 degrees Fahrenheit
5 degrees Fahrenheit
,10 degrees Fahrenheit
32 degrees Fahrenheit
Give this one a try later!
10 degrees Fahrenheit
During severe geomagnetic activity, if PJM observes GIC flow that exceeds a GIC
operating limit at two or more transformers, PJM will declare which of the following?
Geomagnetic Disturbance Action
Geomagnetic Disturbance Warning
NOAA Alert
GIC Alert
Give this one a try later!
Geomagnetic Disturbance Action
Your outage scheduling group has scheduled a planned outage to start today at
0800. Unfortunately due to weather, the outage will not start until tomorrow at 0700.
In this instance, how will the outage status be treated?
As a forced outage
As an unplanned outage
As "On Time"
As "Late"
Give this one a try later!
, As "On Time"
As a Transmission Owner Operator, if you are monitoring your system and security
analysis indicates constraints or violations on the system, what should you do?
Notify the PJM Master Coordinator
Notify the PJM Transmission Operator
Implement actions to mitigate the problem
Issue a local load dump
Give this one a try later!
Notify the PJM Transmission Operator
If your system configuration was such that you had three parallel line of the same
construction, length, and impedance with a normal rating of 155 MVA and an
emergency rating of 170 MVA. Each of the lines currently has a loading of 130 MVA on
each line. If one of the three lines were to trip out of service, what limits, if any, would
be exceeded?
Normal & Emergency
Normal only
Neither due to the surge impedance loading of the line
Emergency only
Give this one a try later!
Normal & Emergency
, What is the temperature threshold used for issuing a Hot Weather Alert for the
Dominion and EKPC Control Zones?
88 Degrees Fahrenheit
90 Degrees Fahrenheit
93 Degrees Fahrenheit
95 Degrees Fahrenheit
Give this one a try later!
93 Degrees Fahrenheit
If your system was experiencing high voltages, which of the following actions would
you implement to correct the problem?
Disconnect a reactor from the system
Connect a capacitor to the system
Reduce interchange flowing across your system
Disconnect a capacitor from the system
Give this one a try later!
Disconnect a capacitor from the system
The drawing represents what type of relay scheme?
Permissive Under-Reaching Transfer Trip Scheme
Direct Under-reaching Transfer Trip Scheme
Permissive Over-Reaching Transfer Trip Scheme
Phase Comparison Blocking Scheme