• Wrong document? Swap it for free
  • Written by students who passed
  • Immediately available after payment
  • Read online or as PDF
Sell
Where do you study
Your language
Document preview thumbnail
Preview 4 out of 118 pages
Exam (elaborations)

Az Cr-11 Commercial & Residential Electrical License Practice Test Bank 2026

Document preview thumbnail
Preview 4 out of 118 pages

This comprehensive study guide contains verified practice questions and answers for the Arizona CR-11 Electrical Contractor license exam. It delivers precise trade knowledge based on the National Electrical Code alongside critical Arizona Registrar of Contractors statutes and business law requirements. Every multiple-choice question features an italicized correct answer and a bold, italicized rationale to maximize study efficiency and exam success.

Content preview

AZ CR-11 COMMERCIAL & RESIDENTIAL ELECTRICAL
LICENSE PRACTICE TEST BANK 2026
This comprehensive study guide contains verified practice questions
and answers for the Arizona CR-11 Electrical Contractor license exam. It
delivers precise trade knowledge based on the National Electrical Code
alongside critical Arizona Registrar of Contractors statutes and business
law requirements. Every multiple-choice question features an italicized
correct answer and a bold, italicized rationale to maximize study
efficiency and exam success.

1. Under the National Electrical Code (NEC), what is the
minimum sizing for a copper Grounding Electrode
Conductor (GEC) when the ungrounded service-
entrance conductors are 250 kcmil copper?
A. 8 AWG
B. 6 AWG
C. 4 AWG
D. 2 AWG
Answer: C. 4 AWG
Rationale: According to NEC Table 250.66, when the
largest ungrounded service-entrance conductor is over
3/0 AWG through 350 kcmil copper, the minimum size
for the grounding electrode conductor is 4 AWG copper.
2. According to Arizona Registrar of Contractors (ROC)
rules, within how many days must a licensed contractor

,respond in writing to a formal citation or complaint
notice?
A. 5 days
B. 10 days
C. 15 days
D. 30 days
Answer: B. 10 days
Rationale: Arizona Revised Statutes (A.R.S.) § 32-1155
mandates that a contractor must submit a written
answer to a formal complaint or citation within 10 days
of service.
3. Which of the following residential locations does NOT
explicitly require GFCI protection for 125-volt, 15-
ampere, and 20-ampere receptacles?
A. Unfinished basements
B. Crawl spaces at or below grade level
C. Garages
D. Finished living rooms
Answer: D. Finished living rooms
Rationale: NEC 210.8(A) mandates GFCI protection for
areas like garages, unfinished basements, and crawl
spaces due to heightened shock risks, but standard

,finished living rooms do not require GFCI protection
under general rules.
4. What is the maximum distance a worker can travel to
reach a portable fire extinguisher in a commercial
electrical shop where Class A fire hazards exist?
A. 50 feet
B. 75 feet
C. 100 feet
D. 150 feet
Answer: B. 75 feet
Rationale: OSHA standard 1910.157(d)(2) dictates that
travel distance to any portable fire extinguisher for
Class A hazards must not exceed 75 feet.
5. What is the minimum clear working space depth in
front of electrical equipment operating at 480 volts to
ground where there are exposed live parts on one side
and a grounded surface on the other (Condition 2)?
A. 3 feet
B. 3.5 feet
C. 4 feet
D. 4.5 feet
Answer: B. 3.5 feet
Rationale: NEC Table 110.26(A)(1) specifies that for

, Condition 2 (exposed live parts on one side and
grounded parts on the other) operating at a voltage-to-
ground of 151–600 volts, the minimum clear working
depth is 3.5 feet.
6. In Arizona, what is the maximum contract value a
handyman can work on without holding a valid
contractor's license (commonly known as the
handyman exemption)?
A. $500 total, including material and labor
B. $1,000 total, including material and labor
C. $2,500 total, including material and labor
D. There is no monetary exemption if a building permit is
required
Answer: D. There is no monetary exemption if a building
permit is required
Rationale: While A.R.S. § 32-1121(A)(14) establishes a
$1,000 exemption threshold, the exemption is
completely voided if the work requires a local building
permit, regardless of the job price.
7. How many quarter-bends (90 degrees) are permitted
between pull points in a single run of Rigid Polyvinyl
Chloride Conduit (PVC)?

Document information

Uploaded on
July 4, 2026
Number of pages
118
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$25.69

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
Angel009
4.5
(4)
Sold
33
Followers
12
Items
1389
Last sold
2 weeks ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions