PJM TEST REVIEW QUESTIONS


Real time transmission constraints or contingencies may be alleviated with generators
operating ______________ - Answers - off cost out of merit.

Monitoring ___________ may give insights into system constraints. - Answers -
Monitoring LMP's

PJM calls for _____________ reserves to recover ace so that tie line schedules are
maintained. - Answers - PJM calls on synchronized reserves

If not cancelled by PJM, the minimum generation alert expires at the end of the
specified ______________. - Answers - light load period

When PJM declares a hot weather alert, the generation dispatcher should determine if
maintenance can be deferred and notify all generating stations and key personnel. -
Answers -

During system restoration, the two categories of reserves are dynamic and spinning. -
Answers -

During system restoration, frequency should be maintained between 59.75 and 61.00
Hertz. - Answers -

PJM issues a heavy load voltage schedule. Member companies who own generation
facilities should ensure voltage regulators on generating units are in service &
automatic. - Answers -

A unit being dispatched economically by PJM should set its megawatt output based on
the unit's dispatch rate or desired megawatt level. - Answers -

A fossil steam unit is considered fuel limited when it is not capable of running at its
maximum capacity for the next 72 hours - Answers -

During system restoration prior to synchronization of a unit, the dispatcher should
ensure sufficient load is available to stabilize unit operation. - Answers -

A large unit in an external control area near PJM/PJM West trips. The PJM operator will
see ace remain the same, frequency decrease. - Answers -

LMPs will change when marginal generator output changes - Answers -

The two control signals sent by the PJM E M S are regulation and dispatch rate (desired
MW output). - Answers -

, An all-call is the one-way communication system used to disseminate information to
market operation centers. - Answers -

Real time bus prices may be monitored using data viewer. - Answers -

Not offering an available PJM capacity resource into the day ahead market is a violation
of PJMs two settlement market rules. - Answers -

A unit that fails to start when scheduled, would be classified as an unplanned outage. -
Answers -

Maximum Generation Emergency is declared by PJM when generation is required
above the highest incremental economic cost. - Answers -

Maintenance outages are permitted when a unit can be held online until the following
Monday, and system reliability is not affected - Answers -

If PJM ace shows over-generation, actual imports are less than scheduled. - Answers -

PJM will request a Supplementary Status Report when a Maximum Generation
Emergency Alert is issued. - Answers -

If a fossil steam unit has less than 32 hours of fuel at maximum capacity, it should be
bid at maximum emergency. - Answers -

The loss of a large generation unit on the PJM system can be detected by monitoring
frequency and PJM ace. - Answers -

A 1000 megawatt unit has tripped in the PJM control area and the PJM ace now
indicates under-generation of 1050 Megawatt. PJM should request 100% synchronized
reserves be loaded. - Answers -

Alerts are issued in advance of a scheduled load period to allow sufficient time for the
generation dispatcher to prepare for the anticipated capacity shortages - Answers -

The amount of synchronized reserves must be large enough to cover the loss of the
largest single energy contingency. - Answers -

When preparing a supplementary status report (SSR), a steam unit that has 30 hours of
fuel remaining. This unit should be reported as a resource limited unit. - Answers -

PJM responds to capacity shortages by issuing alerts in advance of a scheduled load
period to allow sufficient time for members to prepare for anticipated initial capacity
shortages. - Answers -

Document information

Uploaded on
July 2, 2026
Number of pages
11
Written in
2025/2026
Type
Exam (elaborations)
Contains
Questions & answers
$14.99

Wrong document? Swap it for free Within 14 days of purchase and before downloading, you can choose a different document. You can simply spend the amount again.
Written by students who passed
Immediately available after payment
Read online or as PDF

Seller avatar
Reputation scores are based on the amount of documents a seller has sold for a fee and the reviews they have received for those documents. There are three levels: Bronze, Silver and Gold. The better the reputation, the more your can rely on the quality of the sellers work.
GEEKA
3.8
(376)
Sold
2216
Followers
1450
Items
62635
Last sold
2 hours ago



Why students choose Stuvia

Created by fellow students, verified by reviews

Quality you can trust: written by students who passed their tests and reviewed by others who've used these notes.

Didn't get what you expected? Choose another document

No worries! You can instantly pick a different document that better fits what you're looking for.

Pay as you like, start learning right away

No subscription, no commitments. Pay the way you're used to via credit card and download your PDF document instantly.

Student with book image

“Bought, downloaded, and aced it. It really can be that simple.”

Alisha Student

Working on your references?

Create accurate citations in APA, MLA and Harvard with our free citation generator.

Working on your references?

Frequently asked questions